Fleet readiness: Stocking spare parts and high-tech assets

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Spare Parts Stocking and Expediting in a Fluctuating Demand Environment

• A submitted manuscript is the author's version of the article upon submission and before peer-review. There can be important differences between the submitted version and the official published version of record. People interested in the research are advised to contact the author for the final version of the publication, or visit the DOI to the publisher's website. • The final author version ...

متن کامل

An optimal approach for the joint problem of level of repair analysis and spare parts stocking

We propose a method that can be used when deciding on how to maintain capital goods, given a product design and the layout of a repair network. Capital goods are physical systems that are used to produce products or services. They are expensive and technically complex and have high downtime costs. Examples are manufacturing equipment, defense systems, and medical devices. Due to the high downti...

متن کامل

An approximate approach for the joint problem of level of repair analysis and spare parts stocking

For the spare parts stocking problem, generally METRIC type methods are used in the context of capital goods. A decision is assumed on which components to discard and which to repair upon failure, and where to perform repairs. In the military world, this decision is taken explicitly using the level of repair analysis (LORA). Since the LORA does not consider the availability of the capital goods...

متن کامل

On spare parts optimization

In the book “Optimal inventory modeling of systems: multi-echelon techniques” the author Craig Sherbrooke, who has developed several important model in this area, describes a part of the model cosidered in this manuscript as follows (in “aircraft language”): “When a malfunction is diagnosed on an aircraft, the malfuncioning item is removed from the aircraft and brought into base supply. If a sp...

متن کامل

Approximate dynamic programming for management of high-value spare parts

Purpose – An aircraft manufacturer faces the problem of allocating inventory to a set of distributed warehouses in response to random, nonstationary demands. There is particular interest in managing high value, low volume spare parts which must be available to respond to low-frequency demands in the form of random failures of major components. The aircraft fleet is young and in expansion. In ad...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: IISE Transactions

سال: 2017

ISSN: 2472-5854,2472-5862

DOI: 10.1080/0740817x.2016.1243281