Fixed Shipping Cost Allocation for Just-in-Time (JIT) Lot-Splitting
نویسندگان
چکیده
منابع مشابه
Integrated JIT Lot-Splitting Model with Setup Time Reduction for Different Delivery Policy using PSO Algorithm
This article develops an integrated JIT lot-splitting model for a single supplier and a single buyer. In this model we consider reduction of setup time, and the optimal lot size are obtained due to reduced setup time in the context of joint optimization for both buyer and supplier, under deterministic condition with a single product. Two cases are discussed: Single Delivery (SD) case, and Multi...
متن کاملInventory Cost Evaluation Under VMI Program with Lot Splitting
This paper aims to evaluate inventory cost of a Two-echelon serial supply chain system under vendor managed inventory program with stochastic demand, and examine the effect of environmental factors on the cost of overall system. For this purpose, we consider a two-echelon serial supply chain with a manufacturer and a retailer. Under Vendor managed inventory program, the decision on inventory ...
متن کاملinventory cost evaluation under vmi program with lot splitting
this paper aims to evaluate inventory cost of a two-echelon serial supply chain system under vendor managed inventory program with stochastic demand, and examine the effect of environmental factors on the cost of overall system. for this purpose, we consider a two-echelon serial supply chain with a manufacturer and a retailer. under vendor managed inventory program, the decision on inventory le...
متن کاملTime Bucket Size and Lot-splitting Approach
We address the problem of lot splitting for various time bucket lengths in MRP systems. Two approaches for lot splitting can be applied: either use the same (equal) or a variable number of subbatches. Equal subbatching strategies have logistical and computational advantages. Literature states that variable batching strategies are only marginal better. However, these results do not take into acc...
متن کاملTime bucket length and lot-splitting approach
The effect of time bucket length on the choice of a lot-splitting approach is studied. Due to the continuing pressure to reduce throughput times and increase efficiency, managers apply various measures, such as lot splitting and cycle time reduction programmes, that change the length of the time bucket in their planning systems. It is shown that the choice for a suitable lot-splitting approach ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Operations and Supply Chain Management: An International Journal
سال: 2019
ISSN: 2579-9363
DOI: 10.31387/oscm0390244