Fiscal Implications of Immigration-A Net Present Value Calculation
نویسندگان
چکیده
منابع مشابه
Project Portfolio Selection with the Maximization of Net Present Value
Projects scheduling by the project portfolio selection, something that has its own complexity and its flexibility, can create different composition of the project portfolio. An integer programming model is formulated for the project portfolio selection and scheduling.Two heuristic algorithms, genetic algorithm (GA) and simulated annealing (SA), are presented to solve the problem. Results of cal...
متن کاملNet Present Value with Uncertainty
Projects may be evaluated and compared according to the Net Present Value (NPV) of their cash flow. The NPV is the discounted expected revenues minus the costs over the lifetime of the project. Traditional NPV calculations do not take into account the uncertainty in the variables that influence the revenues and costs. We present a simulation approach to incorporate uncertainty in the NPV calcul...
متن کاملFuzzy Interval Net Present Value
In this paper we conjugate the operative usability of the net present value with the capability of the fuzzy and the interval approaches to manage uncertainty. Our fuzzy interval net present value can be interpreted, besides the usual present value of an investment project, as the present value of a contract in which the buyer lets the counterpart the possibility to release goods/services for m...
متن کاملNet Present Value Simulating with a Spreadsheet
Decision making has always been a difficult process, based on various combinations if objectivity (when scientific tools were used) and subjectivity (considering that decisions are finally made by people, with their strengths and weaknesses). The IT revolution has also reached the areas of management and decision making, helping managers make better and more informed decisions by providing them...
متن کاملA Heuristic Algorithm for Project Scheduling Problem to Maximizing the Net Present Value
This paper deals with resource unconstrained project scheduling problems with the objective of maximizing the net present value (NPV) of project cash flows. Here we present a heuristic algorithm named as differential procedure (Dif_AOA).
In order to evaluate the efficiency of this algorithm, networks with node numbers between 10-1000 and network complexity coefficients between 1.3-6.6 have ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Scandinavian Journal of Economics
سال: 2003
ISSN: 0347-0520,1467-9442
DOI: 10.1111/1467-9442.t01-2-00009