Finite Element Analysis of Thiopave Modified Asphalt Pavement

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Investigating the Performance of Cracked Asphalt Pavement Using Finite Elements Analysis

Occurrence of top down and bottom up fatigue cracking in asphaltic pavements is common. Conventional pavement analysis methods ignore the existence of cracks in asphaltic layers. However, it seems that the responses of cracked pavement would not be the same as a pavement without crack. This paper describes effects of crack type, position and length, and vehicles tire inflation pressure and axle...

متن کامل

An Introduction to Tire/Pavement Noise of Asphalt Pavement

1.0 Introduction ..........................................................................................................................................................2 2.0 Relevant Topics in Sound and Acoustics ............................................................................................................... 2.1 Sound...............................................................

متن کامل

Modified Fixed Grid Finite Element Method in the Analysis of 2D Linear Elastic Problems

In this paper, a modification on the fixed grid finite element method is presented and used in the solution of 2D linear elastic problems. This method uses non-boundary-fitted meshes for the numerical solution of partial differential equations. Special techniques are required to apply boundary conditions on the intersection of domain boundaries and non-boundary-fitted elements. Hence, a new met...

متن کامل

Investigation of Clay Balls in Asphalt Pavement

Clay ball is a pavement surface defect which refers to a clump in which clay or dirt is 8 mixed with hot asphalt mixture. Clay ball is typically caused by a combination of aggregate 9 contamination of clay or soil, high aggregate moisture, and low production temperature at the 10 asphalt plant. It usually appears a few weeks or months after paving under traffic load, after being 11 liquefied an...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: World Journal of Engineering and Technology

سال: 2019

ISSN: 2331-4222,2331-4249

DOI: 10.4236/wjet.2019.72b006