Financiën en strategie: time-to-wait or time-to- market?
نویسندگان
چکیده
منابع مشابه
To wait or not to wait: Optimal ordering under lead time uncertainty and forecast updating
There has been a dramatic increase over the past decade in the number of firms that source finished product from overseas. While this has reduced procurement costs, it has increased supply risk; procurement lead times are longer and are often unreliable. In deciding when and how much to order, firms must consider the lead time risk and the demand risk, i.e., the accuracy of their demand forecas...
متن کاملOnline Train Disposition: To Wait or Not to Wait?
We deal with an online problem arising from bus/tram/train disposition problems. In particular, we look at the case in which the delay is unknown and the vehicle can only wait in a station so as to minimize the passengers’ waiting time. We present deterministic polynomial-time optimal algorithms and matching lower bounds for several problem versions. In addition, all lower bounds also apply to ...
متن کاملTeacher Wait-Time and Learner Initiation: A Single Case Analysis
The prevailing pattern of classroom interaction is a tripartite exchange structure known as IRF (teacher initiation, student response, teacher follow-up/feedback; Sinclair & Coulthard, 1975). Although it has its own contributions to classroom discourse, it has been criticized on several grounds, particularly for affording minimum learner participation opportunities (Kasper, 2001). An alternativ...
متن کاملTime to Stop Helicobacter pylori, no Matter with Antibiotic, Probiotic or Vaccine
To get rid of problematic reports of H. pylori colonization, clinicians’ optimal goal should be to totally bacterial elimination from clinical and environmental samples.
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Maandblad Voor Accountancy en Bedrijfseconomie
سال: 1997
ISSN: 2543-1684,0924-6304
DOI: 10.5117/mab.71.15649