Financial Optimization of the Resource-Constrained Project Scheduling Problem with Milestones Payments

نویسندگان

چکیده

This article presents the resource-constrained project scheduling problem with discounted cash flow maximization criterion from perspective of a contractor. Cash flows are considered as contractor’s expenses related to execution activities and client’s payments (revenue contractor) after completion contractual stages. To solve problem, dedicated techniques generate solutions simulated annealing algorithm proposed. Finally, proposed procedures examined using test library, Project Scheduling Library (PSPLIB). An experimental analysis identified efficient moves for creating solutions, that is backward optimization times stages triple justification.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

The Combinatorial Multi-Mode Resource Constrained Multi-Project Scheduling Problem

This paper presents the formulation and solution of the Combinatorial Multi-Mode Resource Constrained Multi-Project Scheduling Problem. The focus of the proposed method is not on finding a single optimal solution, instead on presenting multiple feasible solutions, with cost and duration information to the project manager. The motivation for developing such an approach is due in part to practica...

متن کامل

Solving Resource-Constrained Project Scheduling Problem with Particle Swarm Optimization

This paper presents a Particle SwarmOptimization (PSO) algorithm for solving Resource-Constrained Project Scheduling Problems (RCPSP). The PSO model is a new population based optimization strategy introduced by Kennedy and Eberhart in 1995. The PSO is a cooperative and competitive algorithm who belongs to the class of the evolutionary algorithms. We here specialize the algorithm of PSO to the p...

متن کامل

A THEORETICALLY CORRECT RESOURCE USAGE VISUALIZATION FOR THE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM

The cumulative resource constraints of the resource-constrained project scheduling problem (RCPSP) do not treat the resource demands as geometric rectangles, that is, activities are not necessarily assigned to the same resource units over their processing times. In spite of this fact, most papers on resource-constrained project scheduling mainly in the motivation phase use a strip packing of re...

متن کامل

the combinatorial multi-mode resource constrained multi-project scheduling problem

this paper presents the formulation and solution of the combinatorial multi-mode resource constrained multi-project scheduling problem. the focus of the proposed method is not on finding a single optimal solution, instead on presenting multiple feasible solutions, with cost and duration information to the project manager. the motivation for developing such an approach is due in part to practica...

متن کامل

Splittable stochastic project scheduling with constrained renewable resource

This paper discusses the problem of allocation of constrained renewable resource to splittable activities of a single project. If the activities of stochastic projects can be split, these projects may be completed in shorter time when the available resource is constrained. It is assumed that the resource amount required to accom-plish each activity is a discrete quantity and deterministic. The ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Applied sciences

سال: 2021

ISSN: ['2076-3417']

DOI: https://doi.org/10.3390/app11020661