Typical semiconductor production is re-entrant and hence requires priority decisions when parts compete for production capacity at the same machine. A standard way to run such a factory is to start to plan and to finish according to demand. Often this results in a push policy where early production steps have priority over later production steps at the beginning of the production line and a pul...

متن کامل

Re-entrant Manufacturing Systems

Re-entrant manufacturing systems differ from traditional manufacturing systems in the sense that a job may visit a service station more than once, at various stages of the product development cycle. Several parts at different stages of processing may be in contention for service at the same machine, which gives rise to the need to solve scheduling problems. This document surveys some of the fac...

متن کامل

Analysis of Control Mechanisms in a Re - entrant Manufacturing System

Modern semiconductor wafer fabrication facilities need to run at high levels of utilization in order to absorb the huge investments made in facilities and equipment. Simultaneously these facilities desire to minimize the cycle times of products in the factory for a variety of reasons including improved customer response, increased yield, and support of product development efforts. However, prob...

متن کامل

Control of Manufacturing Systems with Re-entrant Lines

In this paper a mathematical framework of the control theory of manufacturing systems is proposed. All possible plant structures are classiied. A mathematical dynamical model which describes the dynamics of a plant is developed. With the help of this model it is shown how the real time control policy which guarantees the stable work of the plant with the quasi-maximal production rate can be des...

متن کامل

Scheduling Manufacturing Systems of Re{entrant Lines

Re{entrant lines are manufacturing systems where parts may return more than once to the same machine, for repeated stages of processing. Examples of such systems are semiconductor manufacturing plants. We consider the problems of scheduling such systems to reduce manufacturing lead times, variations in the manufacturing lead times, or holding costs. We assume a deterministic model, which allows...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Applied Mathematical Modelling

سال: 2015

ISSN: 0307-904X

DOI: 10.1016/j.apm.2015.03.061