Feasibility study of the Kerinci 350 MW hydro power plant

نویسندگان

چکیده

The demand for electricity is currently growing rapidly. In accordance with the government's policy to optimize use of renewable energy sources, including water, by constructing a hydroelectric power plant. study potential utilization Batang river flow aimed at how much optimum electric there in Merangin as hydropower results calculation Kerinci PLTA show that electrical can be generated 366.27 MW and produced annually 1,443.86 GWh. cash project consists technical estimates, revenues, operating maintenance costs, inflation, taxes, depreciation. Benefit-cost ratio analysis calculated according probable economic conditions during construction lifetime. initial investment cost plant around 12,922,000,000,000. net present value obtained 423,372,934,373, internal rate return 10.7%, on equity 16.2 years benefit-cost 1.2. built terms both technology money.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Pre-Feasibility Study of a Solar Power Plant Project: Case of Ahwaz City

Ahwaz city located in area 8136 square kilometers with population 1338126 people in southwest of Iran in center of Khuzestan province. This city received average 19.56 megajol per square meter per day, average annual sunny day 3088.2 hours, skyline coefficient greater than 0.64 and air transparency more than 0.776 are high potential for use in solar energy systems. In this research, fuzzy AHP a...

متن کامل

analysis of power in the network society

اندیشمندان و صاحب نظران علوم اجتماعی بر این باورند که مرحله تازه ای در تاریخ جوامع بشری اغاز شده است. ویژگیهای این جامعه نو را می توان پدیده هایی از جمله اقتصاد اطلاعاتی جهانی ، هندسه متغیر شبکه ای، فرهنگ مجاز واقعی ، توسعه حیرت انگیز فناوری های دیجیتال، خدمات پیوسته و نیز فشردگی زمان و مکان برشمرد. از سوی دیگر قدرت به عنوان موضوع اصلی علم سیاست جایگاه مهمی در روابط انسانی دارد، قدرت و بازتولید...

15 صفحه اول

Dynamic Modeling and Identification of The Hydro Turbine Using Field Test Data (Case Study: Abbaspour Power Plant)

In order to study the stability and fast dynamic of the power grid, modeling and identification of hydropower plant systems such as turbine, governor and excitation is required. Turbine is a mechanical device and usually identified through field tests. In this paper, the identification of the unit 8 of Abbaspour power plant is conducted. The linear and nonlinear model of the Francis turbine are...

متن کامل

Simulation Model of Hydro Power Plant Using Matlab/Simulink

Hydropower has now become the best source of electricity on earth. It is produced due to the energy provided by moving or falling water. History proves that the cost of this electricity remains constant over the year. Because of the many advantages, most of the countries now have hydropower as the source of major electricity producer. The most important advantage of hydropower is that t is gree...

متن کامل

Plant and Operational Safety of Hydro Power Plants

The construction of large hydropower plants involves potentially high risks for the health and lives of persons as well as for the environment. Therefore a particularly high level of safety is required for such plants. The implementation of such high safety standards in power plants begins with construction measures such as the selection of suitable material, dimensions and monitoring the quali...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: International Journal of Applied Power Engineering

سال: 2022

ISSN: ['2252-8792', '2722-2624']

DOI: https://doi.org/10.11591/ijape.v11.i4.pp325-332