Factors influencing school building construction projects abandonment

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

An exploration into cost-influencing factors on construction projects

Construction cost overrun is a common problem in construction industries. The objective of this research is to extract the key cost-influencing factors with new concept and methods to help control the expenditure. Hence, this research adopts the Modified Delphi Method (MDM) with 2 groups and 2 rounds and Kawakita Jiro method (KJ) to consolidate the experts' opinions and identify and rank the ke...

متن کامل

Investigating Factors Influencing Non-use and Abandonment of Microblogging Services

This study explores the reason for non-usage and abandonment of microblogging. While previous studies mainly focused on individual behaviors associated with the use of social media, this research identifies why people do not use, or terminate their microblogging accounts. Studying the reasons for non-usage and abandonment is important as it helps organizations devise strategies to counteract th...

متن کامل

Modeling construction time in Spanish building projects

The literature states that project duration is affected by various scope factors. Using 168 building projects carried out in Spain, this paper uses the multiple regression analysis to develop a forecast model that allows estimating project duration of new builds. The proposed model uses project type, gross floor area (GFA), the cost/GFA relationship and number of floors as predictor variables. ...

متن کامل

Factors influencing the location of landuses in the Rural Projects

Locational analysis of landuse is being considered as relatively final step regarding landuse Planning. It is being argued that the locational analysis is being influenced by many varied factors. However, optimum location is associated with great accessibility. This study tries to identify major factors responsible for proposed rural settlements guiding plan in Iran. Different involved criteria...

متن کامل

Investigation of Significant Factors Influencing Time and Cost Overruns in Indian Construction Projects

Time overruns and Cost overruns has been a major issue in many Indian construction projects. The successful execution of construction projects and keeping them within prescribed schedule and cost is very important for effective time performance and cost performance. This research work is carried out on studying significant factors causing Time overruns and Cost overruns in Indian construction p...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: International Journal of Construction Management

سال: 2019

ISSN: 1562-3599,2331-2327

DOI: 10.1080/15623599.2019.1675025