Factors Affecting Rework Costs in Construction
نویسندگان
چکیده
منابع مشابه
Factors Affecting Rework Costs in Construction
Rework adversely impacts the performance of building projects. In this study, data were analyzed from 788 construction incidents in 40 Spanish building projects to determine the influence of project and managerial characteristics on rework costs. Finally, regression analysis was used to understand the relationship between the contributing factors, and to determine a model for rework prediction....
متن کاملFactors affecting occupational accidents in the construction industry (2009-2013)
Background: There is a high prevalence of occupational injuries due to accidents in construction industries which affect human health. Therefore, the exploration and analysis of contributing factors of such accidents can lead to their prevention and the reduction of their consequences. This study was conducted with the aim to identify factors related to occup...
متن کاملInfluence of Project Type and Procurement Method on Rework Costs in Building Construction Projects
While it is widely recognized that additional costs due to rework can have an adverse effect on project performance, limited empirical research has been done to investigate the influencing factors. The research presented in this paper aims to determine the influence of different project types and procurement methods on rework costs in construction projects. Using a questionnaire survey, rework ...
متن کاملStrategic factors affecting warehouse maintenance costs
Purpose – The purpose of this paper is to determine the fundamental factors influencing maintenance costs of logistic buildings and to provide benchmark indications for designing maintenance efficient warehouses that contribute to the enhancement of business performance. Design/methodology/approach – The relations between factors and indicators of building facilities maintenance costs are exami...
متن کاملLot sizing with rework and different inspection costs
This paper deals with the single machine multi-product lot scheduling problem in which defective items are produced in any production run of each product. We have adopted the common cycle scheduling policy and assumed that the setup times for production of each product can be non-zero. Further, we have assumed that defective items will be reworked and the inspection costs during the normal prod...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Journal of Construction Engineering and Management
سال: 2017
ISSN: 0733-9364,1943-7862
DOI: 10.1061/(asce)co.1943-7862.0001324