Extraction of underlying factors causing construction projects delay in Nigeria

نویسندگان

چکیده

Purpose This paper aims to establish the most underlying factors causing construction projects delay from applicable. Design/methodology/approach The conducted survey of experts using systematic review vast body literature which revealed 23 common affecting delay. Consequently, this study carried out reliability analysis, ranking significance index measurement parameters (SIDP), correlation analysis and factor analysis. From result grouped a specific into three six applicable that correlated strongly with project Findings finds all test be consistent. It suggests quality control, schedule/program work, contractors’ financial difficulties, political influence, site conditions price fluctuation for delay, are in top 25% according SIDP score at same time associated Research limitations/implications is recommending prospective research should use qualitative inductive approach investigate whether any new, not previously identified, impact can discovered as it followed an approach. Practical implications includes policymakers industry Nigeria focus on measuring key suppliers’ delivery performance late materials by supplier rescheduling work activities extra or waiting workers well management team site. Also, stakeholders encouraged leverage amount data produced backlog schedules, as-built drawings models, computer-aided designs (CAD), costs, invoices employee details, among many others through aid state-of-the-art driven technologies such artificial intelligence machine learning make business decisions will help drive further profitability. Furthermore, these climatological obtained weather observations minimize bad during construction. Originality/value establishes (late supplier, poor decision-making Inclement weather)

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Analyzing delay causes in Egyptian construction projects

Construction delays are common problems in civil engineering projects in Egypt. These problems occur frequently during project life-time leading to disputes and litigation. Therefore, it is essential to study and analyze causes of construction delays. This research presents a list of construction delay causes retrieved from literature. The feedback of construction experts was obtained through i...

متن کامل

Revisiting the Critical Factors Causing Failure of Construction Projects in Vietnam

The Vietnam construction industry has considerably developed since 1986 as a result of “Doi Moi” or all-round renovation process, stepping in the general development trend and the process of gradual globalization and regionalization. However, despite the pace of economic reforms, obstacles and risks have continued to plague the construction industry. This paper attempts to elicit the perception...

متن کامل

Significant Factors Causing Cost Overruns in Large Construction Projects in Malaysia

Once a construction projects fails in achieving effective cost performance, it will result to cost overmn. These ovemrns are caused from several factors which are very important to uncover for improving the cost performance. In Malaysia, not many research works have been carried out on study~ng cost performance factors. Hence, this study was conducted to identify the significant factors causing...

متن کامل

Factors of Complexity in Construction Projects

Construction projects are often described as being complex; however, the relationship between project complexity and other key project components such as risk and uncertainty is not widely established. As part of a global research project aimed at establishing the impact of project complexity at the pre construction stage, research has been carried out to investigate this relationship. Intervie...

متن کامل

prediction of ignition delay period in d.i diesel engines

a semi-empirical mathematical model for predicting physical part of ignition delay period in the combustion of direct - injection diesel engines with swirl is developed . this model based on a single droplet evaporation model . the governing equations , namely , equations of droplet motion , heat and mass transfer were solved simultaneously using a rung-kutta step by step unmerical method . the...

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of Engineering, Design and Technology

سال: 2021

ISSN: ['1726-0531', '1758-8901']

DOI: https://doi.org/10.1108/jedt-04-2021-0211