Extracting the workflow critical path from the extended well-formed workflow schema

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Workflow Timed Critical Path Optimization

Approaches to shorten workflow execution time have been discussed in many area of computer engineering such as parallel and distributed systems, a computer circuit, and PERT chart for project management. To optimize workflow model structure of workflow, an approach with corresponding algorithms is proposed to cut timed critical path of workflow schema, which has the longest average execution ti...

متن کامل

Finding the critical path in a time-constrained workflow

The concept of the critical path has not been much addressed in a workflow even though it has been studied in many areas of computer engineering such as a directed acyclic graph. In this paper we first specify workflow control constructs which create workflow control structures used to describe business processes. And, we propose a method to find out the critical path in a time-constrained work...

متن کامل

effective workflow for optimization of intelligent well completions

intelligent wells provide the ability for monitoring and control of downhole environment of the wells. downhole monitoring is achieved through sensors while control is realized with downhole valves. recovery from intelligent wells can be improved by proper selection of candidate wells/fields and optimizing the number, location and performance of the installed interval control valves. design cri...

متن کامل

From Software Process to Workflow Process: the Workflow Lifecycle

Despite the great effort devoted to the development of Workflow models and Workflow Management Systems during the last decade, a strong foundation about workflow development is still to come. Assuming that a workflow is a complex software product, in this paper we argue that the principles and techniques of software development — in particular, methodological concerns— can help in the developme...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of Computer and System Sciences

سال: 2005

ISSN: 0022-0000

DOI: 10.1016/j.jcss.2004.07.001