Exposure Time Impact on the Geomechanical Characteristics of Sandstone Formation during Horizontal Drilling

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

the impact of morphological awareness on the vocabulary development of the iranian efl students

this study investigated the impact of explicit instruction of morphemic analysis and synthesis on the vocabulary development of the students. the participants were 90 junior high school students divided into two experimental groups and one control group. morphological awareness techniques (analysis/synthesis) and conventional techniques were used to teach vocabulary in the experimental groups a...

15 صفحه اول

the effect of e-64 on the developmental competence of sheep cocs during in vitro maturation

in the present study, the effect of e-64 at different concentrations (0.5, 1, 5 and 10 µm) added to (1) the ivm medium on oocyte nuclear maturation and developmental competence of ovine oocytes, and (2) to the ivc medium on embryonic development of ovine embryos were investigated.

the impact of peer review on efl reviewers writing proficiency

امروزه تصحیح همکلاسی در کلاسهای نگارش یکی از اجزاء لاینفک کلاسهای دانش آموز محور است. تاثیرات مفید تصحیح همکلاسی بر زبان آموزان، معلمان را متقاعد کرده است که علیرغم صرف زمان، انرژی و توان بسیار، از این شیوه ی آموزشی در کلاسهای آموزش نگارش بهره بگیرند. تحقیق حاضر بر آن است تا با مقایسه دو گروه از یادگیرندگان زبان انگلیسی، تاثیر تصحیح همکلاسی را بر توانایی نوشتاری آنها نشان دهد. 122 خانم زبان آمو...

15 صفحه اول

the impact of skopos on syntactic features of the target text

the present study is an experimental case study which investigates the impacts, if any, of skopos on syntactic features of the target text. two test groups each consisting of 10 ma students translated a set of sentences selected from advertising texts in the operative and informative mode. the resulting target texts were then statistically analyzed in terms of the number of words, phrases, si...

15 صفحه اول

the impact of using inspirational quotes on abstract vocabulary recall

the present study is an attempt to investigate the potential impact of inspirational quotes on improving english abstract vocabulary recall. to achieve this goal, a multiple choice language proficiency test of 60 items including vocabulary and grammar component was administered to a sample of 63 second-semester male and female students whose age ranged between 17 to 22 and they were studying en...

15 صفحه اول

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Molecules

سال: 2020

ISSN: 1420-3049

DOI: 10.3390/molecules25112480