Exploiting Identical Generators in Unit Commitment
We present sufficient conditions under which thermal generators can be aggregated in mixed-integer linear programming (MILP) formulations of the unit commitment (UC) problem, while maintaining feasibility and optimality for the original disaggregated problem. Aggregating thermal generators with identical characteristics (e.g., minimum/maximum power output, minimum up/down-time, and cost curves)...
متن کامل105 Bit - Commitment Using Pseudorandom Sequence Generators
A pseudorandom sequence generator (PRSG) maps a “short” random seed to a “long” pseudorandom bit string. For a PRSG to be cryptographically strong, it must be difficult to correctly predict any generated bit, even knowing all of the other bits of the output sequence. In particular, it must also be difficult to find the seed given the output sequence, since if one knows the seed, then the whole ...
متن کاملUnit Commitment Solution Methods
An effort to develop a unit commitment approach capable of handling large power systems consisting of both thermal and hydro generating units offers a large profitable return. In order to be feasible, the method to be developed must be flexible, efficient and reliable. In this paper, various proposed methods have been described along with their strengths and weaknesses. As all of these methods ...
متن کاملAttacks Against Filter Generators Exploiting Monomial Mappings
Filter generators are vulnerable to several attacks which have led to well-known design criteria on the Boolean filtering function. However, Rønjom and Cid have observed that a change of the primitive root defining the LFSR leads to several equivalent generators. They usually offer different security levels since they involve filtering functions of the form F (x) where k is coprime to (2 − 1) a...
متن کاملUnit Commitment on the Cloud
The advent of High Performance Computing (HPC) has provided the computational capacity required for power system operators (SO) to obtain solutions in the least time to highly-complex applications, i.e., Unit Commitment (UC). The UC problem, which attempts to schedule the least-cost combination of generating units to meet the load, is increasing in complexity and problem size due to deployments...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: IEEE Transactions on Power Systems
سال: 2018
ISSN: 0885-8950,1558-0679
DOI: 10.1109/tpwrs.2017.2783850