Experimental set up for magnetomechanical measurements with a closed flux path sample

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Experimental Flux Measurements on a Network Scale

Metabolic flux is a fundamental property of living organisms. In recent years, methods for measuring metabolic flux in plants on a network scale have evolved further. One major challenge in studying flux in plants is the complexity of the plant's metabolism. In particular, in the presence of parallel pathways in multiple cellular compartments, the core of plant central metabolism constitutes a ...

متن کامل

Experimental set - up and data

Autocatalytic reaction fronts between reacted and unreacted species may propagate as solitary waves, namely at a constant front velocity and with a stationary concentration profile, resulting from a balance between molecular diffusion and chemical reaction. A velocity field in the supporting medium may affect the propagation of such fronts through different phenomena: convection, diffusion enha...

متن کامل

Bi-Level Control Policy for Redundant Repairable Multicomponent System with Reneging, Set Up and Vacation

This paper deals with bi-level control policy and queuing analysis of a machine repair problem. The model is developed by incorporating mixed standbys (cold and warm), reneging, set up and vacation time. The repair facility consists of two heterogeneous repairmen in the system. The life and repair time of the failed units and also their set up times are assumed to be exponentially distributed. ...

متن کامل

A three-stage assembly flow shop scheduling problem with blocking and sequence-dependent set up times

This paper considers a three-stage assembly flowshop scheduling problem with sequence-dependent setup < /div> times at the first stage and blocking times between each stage in such a way that the weighted mean completion time and makespan are minimized. Obtaining an optimal solution for this type of complex, large-sized problem in reasonable computational time using traditiona...

متن کامل

A Flow shop Production Planning Problem with basic period policy and Sequence Dependent set up times

Many authors have examined lot sizing, scheduling and sequence of multi-product flow shops, but most of them have assumed that set up times are independent of sequence. Whereas dependence of set up times to sequence is more common in practice. Hence, in this paper, we examine the discussed problem with hypothesis of dependence of set up times to sequence and cyclic schedule policy in basic peri...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Open Physics

سال: 2020

ISSN: 2391-5471

DOI: 10.1515/phys-2020-0160