EXPERIMENTAL OPERATION OF BOX SHIELD TUNNELING MACHINE
نویسندگان
چکیده
منابع مشابه
Application of artificial intelligence methods for estimation of maximum surface settlement caused by EPB shield tunneling
Maximum surface settlement (MSS) is an important parameter for the design and operation of earth pressure balance (EPB) shields that should determine before operate tunneling. Artificial intelligence (AI) methods are accepted as a technology that offers an alternative way to tackle highly complex problems that can’t be modeled in mathematics. They can learn from examples and they are able...
متن کاملA new regulated method in cutter system of shield tunneling machine
Hu Shi*, Guofang Gong**, Huaiyin Liu***, Lintao Wang**** *Corresponding author, Zhejiang University Hangzhou, Zhejiang, 310027, China, E-mail: [email protected] **Zhejiang University Hangzhou, Zhejiang, 310027, China, E-mail: [email protected] ***Zhejiang University Hangzhou, Zhejiang, 310027, China, E-mail: [email protected] ****Zhejiang University Hangzhou, Zhejiang, 310027, China, E-mail: ...
متن کاملHybrid Control Design for a Robot Manipulator in a Shield Tunneling Machine
In a novel shield tunneling method, the tunnel lining is produced by an extrusion process with continuous shield advance. A robotic manipulator is used to build the tunnel supporting formwork, consisting of rings of steel segments. As the shield of the tunnel-boring machine advances, concrete is continuously injected in the space between the formwork and the surrounding soil. This technology re...
متن کاملPrediction of maximum surface settlement caused by earth pressure balance shield tunneling using random forest
Due to urbanization and population increase, need for metro tunnels, has been considerably increased in urban areas. Estimating the surface settlement caused by tunnel excavation is an important task especially where the tunnels are excavated in urban areas or beneath important structures. Many models have been established for this purpose by extracting the relationship between the settlement a...
متن کاملKey Construction Technology of Shield Tunneling Crossing underneath a Railway
The shield tunnel of the Kunming subway crosses beneath the Kun-Shi Railway. Due to the high requirements of railway track for settlement control, this article proposes the following technical measures for controlling the settlement based on the analysis of risks arising from the shield crossing railway: (1) Reinforcing the stratum of the region crossed by the shield in advance to achieve high ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Doboku Gakkai Ronbunshu
سال: 1993
ISSN: 0289-7806,1882-7187
DOI: 10.2208/jscej.1993.480_157