Experience of using loose parts monitoring systems at Novovoronezh NPP
نویسندگان
چکیده
In VVER reactor plants, it is impossible to completely exclude the appearance of loose, loosely fixed and foreign objects in main circulation circuit. Operational experience shows that early detection estimation parameters such incidents can provide time required eliminate or minimize damage equipment plant. For this reason, most modern power units with pressurized water reactors (PWR, VVER) are equipped a loose parts monitoring system (LPMS). At under construction, these systems laid down as standard ones; put into commercial operation Soviet period were also them. The requirements for them established by international standards. Ongoing research work area aimed at determining root cause acoustic anomaly localization its epicenter. Also, no less significant works mass object (LO). precise definition parameter will make possible have an idea nature LO before withdrawal from primary circuit conclude about whether accidentally found detached part steam generators, pumps, internal devices shut-off control valves.
منابع مشابه
Update of S-NPP VIIRS Thermal Emissive Bands Radiometric Calibration Stability Monitoring Using the Moon
The Suomi-NPP VIIRS thermal emissive bands (TEB) are radiometrically calibrated on-orbit with reference to an onboard blackbody (BB) regularly operated at approximately 292.5 K. The calibration stability at other temperature ranges can be evaluated based on the observations of remote targets with stable thermal properties, such as the Moon. VIIRS has scheduled viewings of the Moon on a nearly m...
متن کاملLoose Compositions for Autonomic Systems
From 13.01. to 18.01.2008, the Dagstuhl Seminar 08031 Software Engineering for Self-Adaptive Systems was held in the International Conference and Research Center (IBFI), Schloss Dagstuhl. During the seminar, several participants presented their current research, and ongoing work and open problems were discussed. Abstracts of the presentations given during the seminar as well as abstracts of sem...
متن کاملOn the optimal use of loose monitoring in agencies
We study the governance implications of firms being privately informed of their potential productivity before contracting with an agent to supply unobservable effort. We show that it can be optimal for high potential firms to have ‘‘loose monitoring’’ in the sense that the monitoring system is less perfect than what is implied by a standard agency model a la Holmstrom (The Bell J Econ 10:74–91,...
متن کاملSignal Design at lsolated lntersecaions Using Expert Systems Technology
The procedural steps for developing an expert system for designing signals at isolated intersections are described and the most important development issues for each step are discussed. The steps include problem analysis and definition, preliminary prototype specification, knowledge acquisition strategy development, prototype development plan, knowledge extraction, knowledge representation, too...
متن کاملLoose housing of sows – current systems
Introduction The pig producer is faced with many challenges when establishing new pig facilities today. Besides existing legislation, he must often take into consideration market requirements concerning contract production, neighbours and others and try to minimise the nuisances related to odour and transport of animals, etc. At the same time, the design of the housing facilities must be aimed ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Nuclear Energy and Technology
سال: 2022
ISSN: ['2452-3038']
DOI: https://doi.org/10.3897/nucet.8.94106