Examining Year-long Leadership Gains in FFA Members by Prior FFA Involvement, Class Year, and Gender

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Acute enhancement of insulin secretion by FFA in humans is lost with prolonged FFA elevation.

The in vivo effect of elevated free fatty acids (FFA) on β-cell function in humans remains extremely controversial. We examined, in healthy young men, the acute (90 min) and chronic (48 h) effects of an approximately twofold elevation of plasma FFA vs. control on glucose-stimulated insulin secretion (GSIS). GSIS was studied in response to a graded intravenous glucose infusion (peak plasma gluco...

متن کامل

Fastidious Farmer Algorithms (FFA)

Approximently 10,000 years ago, civilization began in the Fertile Crescent of Mesopotamia around the river valleys of the Euphrates and the Tiger rivers. It was agriculture that allowed these civilizations to prosper and the river water that allowed agriculture. The number of people in the world has grown signi cantly since then increasing the demand for food production. Agriculture has been fo...

متن کامل

Functional subdomains within human FFA.

The fusiform face area (FFA) is a well-studied human brain region that shows strong activation for faces. In functional MRI studies, FFA is often assumed to be a homogeneous collection of voxels with similar visual tuning. To test this assumption, we used natural movies and a quantitative voxelwise modeling and decoding framework to estimate category tuning profiles for individual voxels within...

متن کامل

Comparing the FFA and Senate Bills

By the end of October 1995, the Senate and House agriculture committees had sent farm bills to their respective budget committees for reconciliation. The House Committee on Agriculture actually was unable to achieve a consensus; Chairman Pat Roberts (R-Kan.) subsequently sent his Freedom to Farm Act (FFA) to the House Budget Committee. On the Senate side, a compromise bill was approved, though ...

متن کامل

A Three Year Study of Student Achievement and Factors Related to Achievement in a State FFA Agricultural Mechanics Contest

This investigation demonstrates the utility of contest score evaluation and the need for further evaluation. Investigations of the prediction value of selected variables could prove useful in the development and enhancement of the contests. The use of trend analysis could explore the progress of contestants’ scores in the various areas of a contest and may indicate areas needing particular atte...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of Agricultural Education

سال: 2015

ISSN: 1042-0541

DOI: 10.5032/jae.2015.03227