Examining the Value of Monte Carlo Simulation for Project Time Management

نویسندگان

چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

combination of monte carlo simulation and system dynamics modeling for project time risk analysis

monte carlo simulation is a standard technique for project risk analysis. however, some assumptions of this technique are not reasonable in real world. when a project falls behind the schedule, managers take actions to improve the performance. nevertheless, most of the simulation models as monte carlo omit these reactions in their analysis, which results in unreasonable wide distributions or ev...

متن کامل

Project Time and Cost Forecasting using Monte Carlo simulation and Artificial Neural Networks

The aim of this study is to present a new method to predict project time and cost under uncertainty. Assuming that what happens in projects implementation which is expressed in the form of Earned Value Management (EVM) indicators is primarily related to the nature of randomness or unreliability, in this study, by using Monte Carlo simulation, and assuming a specific distribution for the time an...

متن کامل

A New Approach for Monte Carlo Simulation of RAFT Polymerization

In this work, based on experimental observations and exact theoretical predictions, the kinetic scheme of RAFT polymerization is extended to a wider range of reactions such as irreversible intermediate radical terminations and reversible transfer reactions. The reactions which have been labeled as kinetic scheme are the more probable existing reactions as the theoretical point of view. The ...

متن کامل

Establishing Control Limits on Time Performance Indicators of Projects through Monte Carlo Simulation and Earned Duration Management

Earned Duration Management (EDM) method has been developed to enhance Earned Value Management and to solve some of its problems, such as separation of measuring time and cost dimensions. By providing performance indicators, this method makes it possible for managers to accurately measure the progress of a project and to calculate the time and cost required to complete it. Nevertheless, the acce...

متن کامل

Bremsstrahlung imaging from the liver using the Monte Carlo simulation

Introduction: Most beta and gamma radiation radioisotopes used for treatment are not suitable for imaging. The bremsstrahlung images on a conventional gamma camera helped to localize the radionuclide within and outside of the lesion. Secondary scattering of gamma rays of higher energy and bremsstrahlung causes contamination in the energy window and reducing the contrast and resolution of the im...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Management:Journal of Sustainable Business and Management Solutions in Emerging Economies

سال: 2018

ISSN: 2406-0658,1820-0222

DOI: 10.7595/management.fon.2018.0004