Evaluation of Time, Cost, and Factors Causing Delay of Grounding and Lightning Protection Installation Project

نویسندگان

چکیده

The problem faced by one of the private construction companies in Jakarta, Indonesia is delay completing grounding and lightning protection installation project. This resulted both material immaterial losses for company. Factors that are thought to cause delays this project include man, machine, material, environment factors. method used research Critical Path Method (CPM) Crashing accelerate duration determine effective time cost can be complete root analysis with fishbone diagrams 5 why as tools find out causes problems formulate corrective actions may taken most efficient acceleration alternative terms applied company additional labour. labour able reduce work smallest compared other alternatives. Meanwhile, factors seen from each factor. factor then basis formulating

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

hazard evaluation of gas condensate stabilization and dehydration unit of parsian gas refinery using hazop procedures

شناسایی مخاطرات در واحد 400 پالایشگاه گاز پارسیان. در این پروزه با بکارگیری از تکنیک hazop به شناسا یی مخاطرات ، انحرافات ممکن و در صورت لزوم ارایه راهکارهای مناسب جهت افزایش ایمنی فرا یند پرداخته میگردد. شرایط عملیاتی مخاطره آمیز نظیر فشار و دمای بالا و وجود ترکیبات مختلف سمی و قابل انفجار در واحدهای پالایش گاز، ضرورت توجه به موارد ایمنی در این چنین واحدهایی را مشخص می سازد. مطالعه hazop یک ر...

the evaluation of language related engagment and task related engagment with the purpose of investigating the effect of metatalk and task typology

abstract while task-based instruction is considered as the most effective way to learn a language in the related literature, it is oversimplified on various grounds. different variables may affect how students are engaged with not only the language but also with the task itself. the present study was conducted to investigate language and task related engagement on the basis of the task typolog...

15 صفحه اول

the effects of time planning and task complexity on accuracy of narrative task performance

هدف اصلی این تحقیق بررسی تاثیر برنامه ریزی زمانی، هم چنین افزایش میزان پیچیدگی تکالیف در نظر گرفته شده بصورت همزمان، بر دقت و صحت و پیچیدگی عملکرد نوشتاری زبان آموزان می باشد. بدین منظور، 50 نفر از دانش آموزان دختر در رده ی سنی 16 الی 18 سال به عنوان شرکت کنندگان در این زمینه ی تحقیق در نظر گرفته شدند و به دو گروه آزمایشی و کنترل بصورت اتفاقی تقسیم شدند. اعضای گروه آزمایشی هر دو تکلیف ساده و پی...

postnatal studies of bats (pipistrellus kuhlii and miniopterus schreibersii) & histomorphology and histochemistry studies of organs and diseases of (neurergus microspilotus and n. kaiseri)

1. to determine whether difference in birth body mass influenced growth performance in pipistrellus kuhlii we studied a total of 12 captive-born neonates. bats were assigned to two body mass groups: light birth body mass (lbw: 0.89 ± 0.05, n=8) and heavy birth body mass (hbw: 1.35 ± 0.08, n=4). heavier body mass at birth was associated with rapid postnatal growth (body mass and forearm length) ...

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: European Journal of Business and Management Research

سال: 2023

ISSN: ['2507-1076']

DOI: https://doi.org/10.24018/ejbmr.2023.8.4.2005