Evaluation of High Rate MBBR to Predict Optimal Design Parameters for Higher Carbon and Subsequent Ammoniacal Nitrogen Removal
نویسندگان
چکیده
منابع مشابه
Removal of Ammoniacal-Nitrogen Removal From an Artificial Landfill Leachate in Downflow Reed Beds
The fate of ammoniacal-nitrogen (NH4-N) was studied in a lab-scale downflow reed bed system treating an artificial landfill leachate. Individual reed beds were submerged by the leachate, then drained and rinsed by tap water. It was discovered that NH4-N was removed by a two-staged process, adsorption onto the reed bed media followed by nitrification into nitrite-nitrogen (NO2-N) and nitrate-nit...
متن کاملa benchmarking approach to optimal asset allocation for insurers and pension funds
uncertainty in the financial market will be driven by underlying brownian motions, while the assets are assumed to be general stochastic processes adapted to the filtration of the brownian motions. the goal of this study is to calculate the accumulated wealth in order to optimize the expected terminal value using a suitable utility function. this thesis introduced the lim-wong’s benchmark fun...
15 صفحه اولthe evaluation and comparison of two esp textbooks available on the iranian market for teaching english to the students of medicine
abstract this study evaluated and compared medical terminology and english for the students of medicine (ii) as two representatives of the textbooks available on the iranian market for teaching english to the students of medicine. this research was performed on the basis of a teacher’s and a number of students’ attitudes and the students’ needs analysis for two reasons: first, to investigate...
15 صفحه اولtechnical and legal parameters for determination of river boundary,( case study haraz river)
چکیده با توسعه شهر نشینی و دخل و تصرف غیر مجاز در حریم رودخانه ها خسارات زیادی به رودخانه و محیط زیست اطراف آن وارده می شود. در حال حاضر بر اساس آئین نامه اصلاح شده بستر و حریم رودخانه ها، حریم کمی رودخانه که بلافاصله پس از بستر قرار می گیرد از 1 تا20 متر از منتهی الیه طرفین بستر رودخانه تعیین، که مقدار دقیق آن در هر بازه از رودخانه مشخص نیست. در کشورهای دیگر روشهای متفاوتی من جمله: درصد ریسک...
15 صفحه اولsimulation and design of electronic processing circuit for restaurants e-procurement system
the poor orientation of the restaurants toward the information technology has yet many unsolved issues in regards to the customers. one of these problems which lead the appeal list of later, and have a negative impact on the prestige of the restaurant is the case when the later does not respond on time to the customers’ needs, and which causes their dissatisfaction. this issue is really sensiti...
15 صفحه اولذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Current Science
سال: 2019
ISSN: 0011-3891
DOI: 10.18520/cs/v116/i12/2083-2088