Estimation method of thermal fatigue life consumption for boiler water wall tubes of thermal power plants

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Modeling and Control of Water Level in Boiler Drum for Nassiriyah Thermal Power Plant

The boiler drum process is a nonlinear, complex and multivariable process which includes significant time delay. Therefore, the control on the water level in the drum is not easy and ideal. The first objective of this paper is to model the drum water level referring to 210 MW power unit for Nassiriyah thermal power plant. The second objective is to study the water level controller operation wit...

متن کامل

‏‎suppression of coke formation in thermal cracking by coke inhibitors‎‏

‏‎the main purpose of this research was to:1.develop a coking model for thermal cracking of naphtha.2.study coke inhibition methods using different coke inhibitors.developing a coking model in naphtha cracking reactors requires a suitable model of the thermal cracking reactor based on a reliable kinetic model.to obtain reliable results all these models shall be solved simultaneously.for this pu...

15 صفحه اول

Thermal Power Plants

Since producing our first steam turbine in 1959, Fuji Electric has manufactured more than 464 steam turbines having a total combined output capacity that exceeds 23,619 MW, and has delivered these turbines to various countries throughout the world. In the industrial sector, Fuji Electric shipped Japan's first supercritical, pure transformation plant in 1973, achieving higher operating efficienc...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Transactions of the JSME (in Japanese)

سال: 2018

ISSN: 2187-9761

DOI: 10.1299/transjsme.17-00397