Estimating Snow Budget of Karaj Dam Reservoir

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

An Application to Dam-Reservoir Projects

The use of cost-benefit analysis to evaluate the net welfare payoffs from water projects has now been an established practice for many years. One of the interesting aspects of such cost-benefit studies is that water projects involve an uncertain flow of costs and benefits, arising from the stochastic nature of streamflows. Hence a basic problem for the cost-benefit analyst is that of incorporat...

متن کامل

Dynamic Analysis of Dam-Reservoir Interaction in Time Domain

In the present paper, some finite element softwares about interaction of dam and reservoir during earthquake in time domain are discussed. Impedance option is used as boundary condition of absorbent of reservoir and wave. For each software, time history analysis of pressure and displacement are done and finally suitable elements for dam structure and reservoir fluid are introduced comparing the...

متن کامل

Issues Problems of Sedimentation in Reservoir Siazakh Dam Case Study

Sedimentation in reservoirs lowers the quality of consumed water, reduce the volume of reservoir, lowers the controllable amount of flood, increases the risk of water overflow during possible floods and the risk of reversal and reduction of dam's useful life. So in all stages of dam establishment such as cognitive studies, phase-1 studies of design, control, construction and maintenance, the pr...

متن کامل

Calibration of Area-Reduction Empirical Method for Dam Reservoir

The mathematical model of Area-Reduction empirical method is written through MATLAB software. Three periods of the hydrologic survey are required to run, calibrate and validatethe model. The Dez Dam, which is one of the most significant dams of the Middle East with three periods of hydrographic surveys in 1972, 2002 and 2011, has been chosen for the investigation. The annual average of the inpu...

متن کامل

Optimization of Dez dam reservoir operation using genetic algorithm

Water reservoir programming studies aim to determine the final cultivated land area based on predefined agricultural models and water requirements. Dam utilization rule curve is also provided in such studies. The system of Dez dam water resources was simulated applying the basic information in order to determine the capability of its reservoir to provide the objectives of the performed plan. As...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: American Journal of Applied Sciences

سال: 2009

ISSN: 1546-9239

DOI: 10.3844/ajas.2009.995.1003