Estimating short-run (SR) and long-run (LR) demand elasticities of phosphate
نویسندگان
چکیده
Many empirical exercises estimating demand functions are concerned with dynamic effects of price and income changes over time. Researchers typically interested in getting estimates both short-run (SR) long-run (LR) elasticities, along their standard errors. This study aimed to contribute estimations elasticities world phosphate fertilisers. It answered the research question “How fertilisers is affected by its own changes, cross other variables?”. Short long run calculated using an economic model this paper. The findings indicate that global inelastic short run. In addition, run, elasticity, yield elasticity inelastic. Our modeling predicts consumption for will increase from 45.35 million tons 2018 around 59.16 2028; which implies average annual growth rate 2.7% P 2 O 5 be required every year consumers additional production capacity may needed order meet future demand. results suggest prices forecast increase, as continues rise no new facilities built.
منابع مشابه
Uk Business Investment: Long-run Elasticities and Short-run Dynamics
Theory tells us that output, the capital stock and the user cost of capital are cointegrated. From the capital accumulation identity, it also follows that the capital stock and investment have a long-run proportional relationship. This has been used to justify the estimation of investment equations embodying a long-run relation between investment and output, rather than between the capital stoc...
متن کاملTax Base Elasticities: A Multi-State Analysis of Long-Run and Short-Run Dynamics
We examine the relative dynamic responses of state personal tax revenues and sales tax bases to changes in state personal income. Our econometric analysis, which includes separate analyses of long-run and short-run dynamics for each state, permits the estimation of asymmetric short-run responses depending upon the relationship between current and expected tax base growth. Results indicate that ...
متن کاملThe Short and Long Run Causality between Agglomeration and Productivity
This study is to investigate the short- and long-run causal relationship between agglomeration (localization and urbanization) economies and labor productivity in the manufacturing sector of 28 Iranian provinces over an 11-year period, 2001–2011. Fully Modified Ordinary Least Squares (FMOLS) method was used to estimate our long-run panel data model. The empirical findings suggested that localiz...
متن کاملShort and Long Run Uncertainty Short and Long Run Uncertainty
Uncertainty appears to have both a short-run and a long-run component, which we measure using rm and macro implied volatility data from options of 30 days to 10 years duration. We ask what may be driving uncertainty over these di erent time horizons, nding that oil price volatility is particularly important for short-run uncertainty, policy uncertainty is particularly important for long-run unc...
متن کاملLong-Run and Short-Run Causality between Stock Price and Gold Price: Evidence of VECM Analysis from India
The prime objective of the study is to identify the long-run and short-run relationship between Indian stock price viz., BSE SENSEX (hereafter named as BSE) and gold price (GOLD) in India. The daily closing price data were collected for the period of ten years ranging from 1st April 2004 to 31st March 2014 with 2490 observations. The study employed two models: Model one us...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Mineral economics
سال: 2022
ISSN: ['2191-2203', '2191-2211']
DOI: https://doi.org/10.1007/s13563-021-00294-z