ESTIMATING SEDIMENT GENERATION FROM ROCK CONSTRUCTION WORKS
نویسندگان
چکیده
The dispersal of fine sediments into receiving waters from dredging and disposal associated with major port developments, the modelling these, is often a focus environmental approval process for construction these works. An aspect that overlooked in assessment works generation sediment sourced directly materials used breakwater revetment construction. While offshore well documented, there little guidance or research has been undertaken quantifying direct placement rock armour. This paper demonstrates method applied to project at Eastland Port NZ quantify construction-generated sediments.
منابع مشابه
Estimating rock mass elastic modulus from seismic resonance measurements
Measuring the elastic modulus of in-situ rock masses over scales of tens of meters remains an important challenge in experimental rock mechanics. We present a new approach using ambient resonance measurements of freestanding rock masses to identify vibrational modes, which are then matched with numerical models implementing bulk, globally representative material properties. The result is an exp...
متن کاملRock Masses as Construction Materials
A rock mass is a material quite different from other structural materials used in civil engineering. It is heterogeneous and quite often discontinuous, but is one of the materials in the earth's crust, which is most used in man's construction. Ideally, a rock mass is composed of a system of rock blocks and fragments separated by discontinuities forming a material in which all elements behave in...
متن کاملEstimating sediment yield from a paved forest road (Asphalt) (Case study: Watershed Leyle, Ravansar)
Extended abstract 1- Introduction Forest roads are among the largest sediment transport sources to drainage network. So, estimating the sediments of the road network is an important factor in the evaluation of the impact of the road construction. One of the biggest problems caused by the road construction in the forest is the increase in various forms of erosion, such as Gully erosion and mas...
متن کاملDesign Tool for Controlling Runoff and Sediment from Highway Construction
Regulations require that stormwater pollution prevention plans be developed for construction activities that disturb an area that is equal to or greater than one acre. Different strategies, including a combination of practices, can be used to develop these plans. The WATER model was a tool developed from a previous project to assess the effectiveness of different on-site sediment control practi...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Proceedings of ... Conference on Coastal Engineering
سال: 2023
ISSN: ['2156-1028', '0589-087X']
DOI: https://doi.org/10.9753/icce.v37.papers.31