Estimating Construction Project Duration and Costs upon Completion Using Monte Carlo Simulations and Improved Earned Value Management

نویسندگان

چکیده

Earned value management (EVM) is widely used when monitoring and estimating operations related to construction projects. As the scope complexity of projects expand, traditional EVM sometimes ineffective even results in conclusions that are contrary actual situation. Additionally, estimate produced by a deterministic does not account for uncertainty activities involved project. This study proposes an estimation approach combines improved EVM, critical path method (CPM), program evaluation review technique (PERT), Monte Carlo simulation (MCS). The contribution threefold. Firstly, path-based schedule measurement described using network diagrams CPM capture logical relationships among activities. Secondly, resource input categorizes improve accuracy duration cost estimates. remaining will be estimated based on execution performance same category. Thirdly, PERT MCS approaches reveal estimates upon completion replacing with possible range. An experimental research was apply proposed approach. result displayed commercial expansion project faced serious delays overruns. Based result, manager should focus highly J, H, G (in order priority) take corrective actions. In conclusion, demonstrates good identifying deviations, precise results, determining importance (priority) need controlled.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Predicting project time and costs using earned value management based on trapezoidal fuzzy numbers

Projects include activities that must be carried out at certain dates, with specified costs and determined qualities in order to satisfy the stakeholders. Project control is one of the most important and widely used issues in project-based organizations and it has attracted a lot of attention. So far, in the field of project control, there have been a lot of research that were done in different...

متن کامل

forecasting project duration by earned duration management and risk management

being observed frequently that projects cannot achieve to their plan duration and their budget. utilizing retrospective method is one of the reasons for this problem. in this research two method, earned duration management and risk management, has been used to remove the gap of the plan and the reality; this enable the project to utilize both high accuracy of the first method and prophecy of th...

متن کامل

Estimation of Project Performance Using Earned Value Management and Fuzzy Regression

Earned Value Management is a critical project managementmethodology that evaluates project performance from cost andschedule viewpoints. The novel theoretical framework presented in thispaper estimates future performance of project regarding the past relativeinformation. It benefits from fuzzy regression (FR) models in estimationprocess in order to deal with the vagueness and impreciseness ofre...

متن کامل

Establishing Control Limits on Time Performance Indicators of Projects through Monte Carlo Simulation and Earned Duration Management

Earned Duration Management (EDM) method has been developed to enhance Earned Value Management and to solve some of its problems, such as separation of measuring time and cost dimensions. By providing performance indicators, this method makes it possible for managers to accurately measure the progress of a project and to calculate the time and cost required to complete it. Nevertheless, the acce...

متن کامل

An ex ante control chart for project monitoring using earned duration management observations

In the past few years, there has been an increasing interest in developing project control systems. The primary purpose of such systems is to indicate whether the actual performance is consistent with the baseline and to produce a signal in the case of non-compliance. Recently, researchers have shown an increased interest in monitoring project’s performance indicators, by plotting them on the S...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Buildings

سال: 2022

ISSN: ['2075-5309']

DOI: https://doi.org/10.3390/buildings12122173