Erratum for “High Rise Building Column Design”

نویسندگان

چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

OPTIMIZED TUNED LIQUID COLUMN DAMPERS FOR EARTHQUAKE OSCILLATIONS OF HIGH-RISE STRUCTURES INCLUDING SOIL EFFECTS

This paper investigates the optimized parameters for the tuned liquid column dampers to decrease the earthquake vibrations of high-rise buildings. Considering soil effects, the soilstructure interaction (SSI) is involved in this model. The Tuned Liquid Column Damper (TLCD) is also utilized on the roof of the building. Since the TLCD is a nonlinear device, the time domain analysis based on nonli...

متن کامل

Current Design of High-Rise Building Drainage System in Taiwan

The main purpose of the research is to find the solution of drainage issues in high-rise building through the observation and basic study of stack fluid mechanism. Firstly, we will investigate the existing high-rise buildings and summarize the design methodology from our previous researches. Through the observations and reviews, this paper would conclude the solutions for existing drainage prob...

متن کامل

Field Monitoring of Column Shortenings in a High-Rise Building during Construction

The automatic monitoring of shortenings of vertical members in high-rise buildings under construction is a challenging issue in the high-rise building construction field. In this study, a practical system for monitoring column shortening in a high-rise building under construction is presented. The proposed monitoring system comprises the following components: (1) a wireless sensing system and (...

متن کامل

Dual Control High-rise Building for Robuster Earthquake Performance

A dual passive control system is proposed for high-rise buildings. Since the proposed system needs a substructure supporting the main building, it is usually used in high-rise residential apartment houses where a parking tower is used as the substructure. This new system consists of a base-isolation system and a building-connection system. While base-isolated buildings and interconnected buildi...

متن کامل

Scheduling for High-rise Building Construction Using Simulation Techniques

High-rise buildings are commonly built in densely populated countries or urban areas. A balanced floor construction cycle is critical for construction of the frame structures. The objectives in scheduling the floor cycle are to ensure smooth flows of resources and to optimise the use of formwork and other materials. The floor area is usually divided into zones to allow the labour force and form...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of the Structural Division

سال: 1979

ISSN: 0044-8001,2690-3377

DOI: 10.1061/jsdeag.0005183