Erratum for “Computer Program for Leveling Resource Usage”
نویسندگان
چکیده
منابع مشابه
A THEORETICALLY CORRECT RESOURCE USAGE VISUALIZATION FOR THE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM
The cumulative resource constraints of the resource-constrained project scheduling problem (RCPSP) do not treat the resource demands as geometric rectangles, that is, activities are not necessarily assigned to the same resource units over their processing times. In spite of this fact, most papers on resource-constrained project scheduling mainly in the motivation phase use a strip packing of re...
متن کاملResource Usage Protocols for Iterators
We discuss usage protocols for iterator objects that prevent concurrent modifications of the underlying collection while iterators are in progress. We formalize these protocols in Java-like object interfaces, enriched with separation logic contracts. We present examples of iterator clients and proofs that they adhere to the iterator protocol, as well as examples of iterator implementations and ...
متن کاملA Branch-and-Price Algorithm for Multi-mode Resource Leveling
Resource leveling is a variant of resource-constrained project scheduling in which a non-regular objective function, the resource availability cost, is to be minimized. We present a branch-and-price approach together with a new heuristic to solve the more general turnaround scheduling problem. Besides precedence and resource constraints, also availability periods and multiple modes per job have...
متن کاملResource Leveling Using Petrinet and Memetic Approach
The problem of scheduling activities dynamic for a project, within the available resources and adhering to precedence relationships is NP hard combinatorial. Traditional approaches and their extensions are limited in application for simultaneous scheduling of resources with leveling. Considering the need for improved modeling and scheduling techniques, this paper proposes the use of Petrinet ba...
متن کاملUsing Hopfield to Solve Resource-Leveling Problem
Although the traditional permute matrix coming along with Hopfield is able to describe many common problems, it seems to have limitation in solving more complicated problem with more constrains, like resource leveling which is actually a NP problem. This paper tries to find a better solution for it by using neural network. In order to give the neural network description of resource leveling pro...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Journal of the Construction Division
سال: 1966
ISSN: 0569-7948,2690-2400
DOI: 10.1061/jcceaz.0000174