Environmental management plan (EMP) for Melamchi water supply project, Nepal

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Environmental management plan (EMP) for Melamchi water supply project, Nepal.

More than 1.5 million people live in the Kathmandu valley. The valley is facing an extreme shortage of water supply. At the same time the demand is escalating rapidly. To address this issue of scarcity of water, the government of Nepal has proposed a project of inter-basin transfer of water from Melamchi River located 40 km north-east of the Kathmandu valley. The project will cover two district...

متن کامل

environmental management plan (emp) for melamchi water supply project, nepal

more than 1.5 million people live in the kathmandu valley. the valley is facing an extreme shortage of water supply. at the same time the demand is escalating rapidly. to address this issue of scarcity of water, the government of nepal has proposed a project of inter- basin transfer of water from melamchi river located 40 km north-east of the kathmandu valley. the project will cover two distric...

متن کامل

Assessment of water supply system and water quality of Lighvan village using water safety plan

Background: Continuous expansion of potable water pollution sources is one of the main concerns of water suppliers, therefore measures such as water safety plan (WSP), have been taken into account to control these sources of pollution. The aim of this study was to identify probable risks and threatening hazards to drinking water quality in Lighvan village along with assessment of bank filtratio...

متن کامل

An Integrated Risk-Based Technique for Project Plan Selection

  Selecting an effective project plan is a significant area in the project management. The present paper introduces a technique to identify the project plan efficient frontier for assessing the alternative project plans and selecting the best plan. The efficient frontier includes two criteria: the project cost and the project time. Besides, the paper presents a scheme to incorporate Directed Ac...

متن کامل

Plan Management Issues for Cognitive Robotics Project Overview

Progress in cognitive robotics can come either from efforts to provide physical robots with more autonomy, or from efforts to make AI techniques more generally applicable to the needs of robotic agents. We are conducting research on dynamic plan management, which is an instance of the latter type of effort. In this paper, we provide an overview of our research project. Plan management is the pr...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Environmental Monitoring and Assessment

سال: 2007

ISSN: 0167-6369,1573-2959

DOI: 10.1007/s10661-007-0074-8