ENVIRONMENTAL EFFECT OF DELAY TIME IN OPEN PIT BLASTING
نویسندگان
چکیده
منابع مشابه
the effect of taftan pozzolan on the compressive strength of concrete in the environmental conditions of oman sea (chabahar port)
cement is an essential ingredient in the concrete buildings. for production of cement considerable amount of fossil fuel and electrical energy is consumed. on the other hand for generating one tone of portland cement, nearly one ton of carbon dioxide is released. it shows that 7 percent of the total released carbon dioxide in the world relates to the cement industry. considering ecological issu...
Application of simulated annealing for optimization of blasting costs due to air overpressure constraints in open-pit mines
Estimating the costs of blasting operations is an important parameter in open-pit mining. Blasting and rock fragmentation depend on two groups of variables. The first group consists of mass properties, which are uncontrollable, and the second one is the drill-and-blast design parameters, which can be controlled and optimized. The design parameters include burden, spacing, hole length, hole diam...
متن کاملImplementation of Hyperbolic Tangent Function to Estimate Size Distribution of Rock Fragmentation by Blasting in Open Pit Mines
Rock fragmentation is one of the desired results of rock blasting. So, controlling and predicting it, has direct effects on operational costs of mining. There are different ways that could be used to predict the size distribution of fragmented rocks. Mathematical relations have been widely used in these predictions. From among three proposed mathematical relations, one was selected in this stud...
متن کاملprediction of ignition delay period in d.i diesel engines
a semi-empirical mathematical model for predicting physical part of ignition delay period in the combustion of direct - injection diesel engines with swirl is developed . this model based on a single droplet evaporation model . the governing equations , namely , equations of droplet motion , heat and mass transfer were solved simultaneously using a rung-kutta step by step unmerical method . the...
Determination of the largest pit with the non-negative net profit in the open pit mines
The determination of the Ultimate Pit Limit (UPL) is the first step in the open pit mine planning process. In this stage that parts of the mineral deposit that are economic to mine are determined. There are several mathematical, heuristic and meta-heuristic algorithms to determine UPL. The optimization criterion in these algorithms is maximization of the total profit whilst satisfying...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Mugla Journal of Science and Technology
سال: 2018
ISSN: 2149-3596
DOI: 10.22531/muglajsci.375843