Enhancing software development cost control by forecasting the cost of rework: preliminary study
نویسندگان
چکیده
<p><span>Industrial reports show massive cost overruns associated with software projects. The of reworks constitutes a large portion the overall cost, reflecting substantial challenge in control. Earned value management (EVM) is most recognized model for project However, it shows many limitations forecasting leading to considerable Nevertheless, major EVM limitation found its inability forecast rework. This research investigated factors affecting this and suggests an enhanced model. significant contribution incorporation software-related into We introduced rework index (SRI), which incorporated traditional enhance predictability at completion, including cost. defined SRI terms two factors: product functional complexity team competency. Finally, we evaluated proposed using dataset drawn from five actual results showed enhancement accuracy.</span></p>
منابع مشابه
control of the optical properties of nanoparticles by laser fields
در این پایان نامه، درهمتنیدگی بین یک سیستم نقطه کوانتومی دوگانه(مولکول نقطه کوانتومی) و میدان مورد مطالعه قرار گرفته است. از آنتروپی ون نیومن به عنوان ابزاری برای بررسی درهمتنیدگی بین اتم و میدان استفاده شده و تاثیر پارامترهای مختلف، نظیر تونل زنی(که توسط تغییر ولتاژ ایجاد می شود)، شدت میدان و نسبت دو گسیل خودبخودی بر رفتار درجه درهمتنیدگی سیستم بررسی شده اشت.با تغییر هر یک از این پارامترها، در...
15 صفحه اولstudy of cohesive devices in the textbook of english for the students of apsychology by rastegarpour
this study investigates the cohesive devices used in the textbook of english for the students of psychology. the research questions and hypotheses in the present study are based on what frequency and distribution of grammatical and lexical cohesive devices are. then, to answer the questions all grammatical and lexical cohesive devices in reading comprehension passages from 6 units of 21units th...
Estimating the development cost of custom software
In this paper an approach for the estimation of software development costs is presented. The method is based on the characterization of the software to be developed in terms of project and environment attributes and comparison with some similar completed project(s) recovered from a historical database. A case study is also presented, focusing on the calibration and application of the method on ...
متن کاملMeasuring the Impact of Rework on Construction Cost Performance
Rework continues to affect both cost and schedule performance throughout the construction industry. The direct costs alone often tally to 5% of the total construction costs. Using the data obtained from 359 construction projects in the Construction Industry Institute database, this paper assesses the impacts of rework on construction cost performance for projects in various categories. In addit...
متن کاملForecasting Final Schedule and Cost of Projects by Using Statistical and Mathematical Method
Earned value management (EVM) has prepared some methods to forecast final costs of projects. These methods were not developed since the start of formation and were gradually completed, of course with one exception that is its authenticity, they are still remained unchanged. At the present time EVM guide does not apply from schedule indices to forecast schedule for completion of project and ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Indonesian Journal of Electrical Engineering and Computer Science
سال: 2021
ISSN: ['2502-4752', '2502-4760']
DOI: https://doi.org/10.11591/ijeecs.v21.i1.pp524-537