Enhanced Resource Leveling Technique for Project Scheduling
نویسندگان
چکیده
منابع مشابه
Resource Leveling in Fuzzy Project Scheduling
In this paper a new method based on fuzzy theory is developed to solve the Project Resource Leveling Problem in fuzzy environment. Resource Leveling Problem attempts to minimize the resource usage fluctuations in project plan. Assuming that the duration of activities and resource requirements are fuzzy, in this method we compute several project characteristics such as earliest times, latest tim...
متن کاملA Multi-objective Scheduling Model for Solving the Resource-constrained Project Scheduling and Resource Leveling Problems
The project resource leveling problem was proposed to smooth resource usage and reduce resource fluctuation, while the resource-constrained project scheduling problem focuses on minimizing the project duration with limited resources. Solving the two interrelated problems separately is unlikely to result in a globally optimum schedule. The few integrated optimization methods that have been devel...
متن کاملResource leveling scheduling by an ant colony-based model
In project scheduling, many problems can arise when resource fluctuations are beyond acceptable limits. To overcome this, mathematical techniques have been developed for leveling resources. However, these produce a hard and inflexible approach in scheduling projects. The authors propose a simple resource leveling approach that can be used in scheduling projects with multi-mode execution activit...
متن کاملA THEORETICALLY CORRECT RESOURCE USAGE VISUALIZATION FOR THE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM
The cumulative resource constraints of the resource-constrained project scheduling problem (RCPSP) do not treat the resource demands as geometric rectangles, that is, activities are not necessarily assigned to the same resource units over their processing times. In spite of this fact, most papers on resource-constrained project scheduling mainly in the motivation phase use a strip packing of re...
متن کاملUncertain Resource Availabilities: Proactive and Reactive Procedures for Preemptive Resource Constrained project Scheduling Problem
Project scheduling is the part of project management that deals with determining when intime to start (and finish) which activities and with the allocation of scarce resources to theproject activities. In practice, virtually all project managers are confronted with resourcescarceness. In such cases, the Resource-Constrained Project Scheduling Problem (RCPSP)arises. This optimization problem has...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Journal of Asian Architecture and Building Engineering
سال: 2005
ISSN: 1346-7581,1347-2852
DOI: 10.3130/jaabe.4.461