Enhanced Long-Run Incremental Cost Pricing Considering the Impact of Network Contingencies
نویسندگان
چکیده
منابع مشابه
Comprehensive Long - Run Incremental Cost ( LRIC ) - Voltage Network Pricing Approach to Support Network Voltages Given Contingencies
most network charges are based on components’ thermal limits providing correct economic signals to reinforcing network transformers and lines. However, less attention is drawn to the reinforcement cost driven by nodal voltage limits, particularly those resulting from contingencies. In this work, a new charging approach is proposed in which busbar power perturbation is linked to busbar voltage d...
متن کاملObservability-Enhanced PMU Placement Considering Conventional Measurements and Contingencies
Phasor Measurement Units (PMUs) are in growing attention in recent power systems because of their paramount abilities in state estimation. PMUs are placed in existing power systems where there are already installed conventional measurements, which can be helpful if they are considered in PMU optimal placement. In this paper, a method is proposed for optimal placement of PMUs incorporating conve...
متن کاملThe Long Run Impact of Technology Diffusion on Average Cost in Upstream Oil Industry; Case Stud of Iran
Literature review related to nonrenewable resources shows that technological improvements have considerable effects on resource depletion and decreasing operational cost. Therefore it is assumed that technology is the most important and influential variables in the production function and utilization cost of these resources. In this study, we assess the long term effect of technology diffusion...
متن کاملImproving Long Run Marginal Cost based Pricing along with Extended Benefit Factor method for Revenue Reconciliation of Transmission Network in Restructured Power System
Abstract : There are several methods to cover the costs of a transmission system and distribution networks. These methods are divided into either incremental or marginal approaches, which can be either long-term or short-term. The main difference between the incremental and marginal approach is how to calculate the cost of using the network. In the incremental approach, simulation and in the ma...
متن کاملObservability-Enhanced PMU Placement Considering Conventional Measurements and Contingencies
Phasor Measurement Units (PMUs) are in growing attention in recent power systems because of their paramount abilities in state estimation. PMUs are placed in existing power systems where there are already installed conventional measurements, which can be helpful if they are considered in PMU optimal placement. In this paper, a method is proposed for optimal placement of PMUs incorporating conve...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: IEEE Transactions on Power Systems
سال: 2012
ISSN: 0885-8950,1558-0679
DOI: 10.1109/tpwrs.2011.2159744