Engineering geological investigations of the Trishuli-Galchhi Hydroelectric Project
نویسندگان
چکیده
منابع مشابه
MICRO-HYDROELECTRIC PROJECT PHASE III Design Team
Phase III development of a micro-hydroelectric power generating system is focused on enhancing the system designed by Phases I and II. The previous phases focused on the use of the Gorlov Helical Turbine (GHT) to derive power from a fresh water environment, specifically the Stevens River in Vermont. Phase III exclusively focused on deriving power from an ocean environment and the construction o...
متن کاملRisk Analysis Simulation Model of Economic Evaluation in Hydroelectric Engineering Project
In this study, we propose a risk analysis simulation model for economic evaluation of hydroelectric engineering project. This model takes annual energy outputs as risk elements. It submits to Pearson-III distribution similar with the annual runoff. Take data from three typical years to estimate the distribution parameters and then yearly benefits can be simulated in given period. By discounting...
متن کاملEffect of engineering geological characteristics of Tehran’s recent alluvia on ground settlement due to tunneling
Ground settlement due to the shallow tunneling in urban areas can have considerable implications for aboveground civilinfrastructures. Engineering geological characteristics of the tunnel host ground including geotechnical parameters of surrounding soil,groundwater situation, and in situ stress condition are amongst the most important factors affecting settlement. In this research, groundsettle...
متن کاملU.S. Geological Survey Scientific Investigations Report 2007-5195
.........................................................................................................................................................
متن کاملTechniques of Water-Resources Investigations OF the United States Geological Survey
Accurate measurement of water levels deeper than 1,000 feet in wells requires specialized equipment. Corrections for stretch and thermal expansion of measuring tapes must be considered, and other measuring devices must be calibrated periodically. Borehole deviation corrections also must be made. Devices for recording fluctuation of fluid level usually require mechanical modification for use at ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Bulletin of the Department of Geology
سال: 1970
ISSN: 1996-3491
DOI: 10.3126/bdg.v13i0.3963