Enforcement of legal remedies against construction projects time overrun in Ethiopia: A critical appraisal

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

The Niche Construction Perspective: a Critical Appraisal*

Niche construction refers to the activities of organisms that bring about changes in their environments, many of which are evolutionarily and ecologically consequential. Advocates of niche construction theory (NCT) believe that standard evolutionary theory fails to recognize the full importance of niche construction, and consequently propose a novel view of evolution, in which niche constructio...

متن کامل

A CRITICAL APPRAISAL OF HUMAN GROWTH STUDIES IN IRAN

Studies of human growth throughout Iran since 1966 have been surveyed critically. Only 32 papers and 15 research reports on this very crucial issue have been published or compiled so far, most of them on Tehran and Shiraz, which is negligible in comparison with American or European and even some African and Asian studies. Though measurements of height and weight naturally predominate, arm ...

متن کامل

International Human Trafficking: Critical Appraisal of Strength and Weaknesses of Nigeria’s Legal Frameworks

Nigeria has been facing the immense challenge of international trafficking in persons for sexual exploitation and forced labor into countries in Europe, Asia and Africa. Being an international criminal activity driven by high profits, Nigeria's adoption of a regulatory policy is expressed in the series of legal provisions to deal with the army of traffickers. In desperation, within a space of 1...

متن کامل

Time Prediction Using a Neuro-Fuzzy Model for Projects in the Construction Industry

This paper presents a prediction model based on a new neuro-fuzzy algorithm for estimating time in construction projects. The output of the proposed prediction model, which is employed based on a locally linear neuro-fuzzy (LLNF) model, is useful for assessing a project status at different time horizons. Being trained by a locally linear model tree (LOLIMOT) learning algorithm, the model is int...

متن کامل

Analysis of Cost Overrun in Highway Construction Projects Using Multiple Regression and Artificial Neural Networks

Cost overruns are more common in infrastructure projects especially, more common in road construction activities. There existed a need to develop a probabilistic cost overrun analysis model in construction projects as a decision support tool for contractors before the bidding stage. The objective of this study is to identify the critical factors affecting cost overrun and obtain statistical mod...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Heliyon

سال: 2020

ISSN: 2405-8440

DOI: 10.1016/j.heliyon.2020.e05126