ENERGY RISK MANAGEMENT AND COST OF ECONOMIC PRODUCTION BIODIESEL PROJECT
نویسندگان
چکیده
منابع مشابه
economic optimization and energy consumption in tray dryers
دراین پروژه به بررسی مدل سازی خشک کردن مواد غذایی با استفاده از هوای خشک در خشک کن آزمایشگاهی نوع سینی دار پرداخته شده است. برای آنالیز انتقال رطوبت در طی خشک شدن به طریق جابجایی، یک مدل لایه نازک برای انتقال رطوبت، مبتنی بر معادله نفوذ فیک در نظر گفته شده است که شامل انتقال همزمان جرم و انرژی بین فاز جامد و گاز می باشد. پروفایل دما و رطوبت برای سه نوع ماده غذایی شامل سیب زمینی، سیب و موز در طی...
15 صفحه اولenergy and economic assessment of biodiesel production from olive pomace oil: a lifecycle approach
the aims of this study were to assess the energy and economic flows of biodiesel production from olive pomace oil using transesterification method with ultrasound waves. for this purpose biodiesel production from this feedstock were examined through a life-cycle process with considering five main stages of agricultural production, transportation, olive oil extraction, pomace oil extraction and ...
متن کاملUsing fuzzy FMEA and fuzzy logic in project risk management
Risk management is one of the most important phases of project management and isthe most recently used by many researchers. In this paper, a fuzzy based method wasproposed which identifies different kinds of risks through the project life cycle.Then, the project risk magnitude can be obtained in regards to five factors, namely“severity”, “occurrence”, and “not detection” which form fuzzy FMEA a...
متن کاملEnergy Management and Process Improvement of Methanol Production
A heat exchanger network (HEN) for the process of methanol synthesis has been studied by combination of pinch design method and the application of “Twisted Tube” heat exchanger units as a new technology. The HEN is reconstructed based on the full utilization of maximum allowable pressure drops for the process hot and cold streams. An algorithm is developed to generate design procedure for twist...
متن کاملAnalysis of interactions among barriers in project risk management
In the context of the scope, time, cost, and quality constraints, failure is not uncommon in project management. While small projects have 70% chances of success, large projects virtually have no chance of meeting the quadruple constraints. While there is no dearth of research on project risk management, the manifestation of barriers to project risk management is a less dwelt topic. The success...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: International Journal of Energy Economics and Policy
سال: 2019
ISSN: 2146-4553
DOI: 10.32479/ijeep.8367