India's power sector is facing an actuate problem of meeting the growing demand electricity. Improving energy efficiency by employing efficient devices would be better alternative for apart new demand. The use motor instead standard induction in agricultural and industrial sector. It will result into substantial saving electrical over a motor. effort taken introduced this paper analyze additional different norm cycle plant addition energize utilization productive Induction Motor with boundary like input (kVA), consumed (kWh), apparent power, factor (kW).

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Industrial Voltage Optimization at Large Industrial Facility Brings Energy Savings

Less is more when it comes to eating healthy and the same can be said of alternating current (AC) voltage inside industrial plants. By using active voltage regulation which incorporates voltage monitoring at the load, an industrial facility can save energy and better protect their equipment and systems. In the early spring of 2007, Plum Creek Timber Company (Plum Creek), Flathead Electric Coope...

متن کامل

The Influence of Industrial Engineering in Semiconductor Fabrication Factory Optimization

To meet competitive market for the electronics consumer products, the integrated circuit is process at the semiconductor fabrication factory which is the most complex and challenging areas in manufacturing. This is due to semiconductor manufacturers will require to process 300 to 1000 steps depends on products, 60,000 WIP and 400 pieces equipment for typical 200mm wafer size technology. Due to ...

متن کامل

The Lime and Flocculant Dose Optimization in the Clarification Process of a Sugar Factory

The objective of this research was the economic analysis of two different methods for the clarification of sugarcane juice. The first method was the method of using 700 ppm of CaO (final pH=7.9) and 1 ppm of Separan flocculant which previouly was being used. The other method was using 500 ppm of CaO (final pH=7.4) and 3 ppm of Separan flocculant. This study was carried out on an industrial scal...

متن کامل

Some Aspects of Factory Operation at the Tongaat Sugar Company Factory

A review of several of the operations carried out Attaining these objectives was complicated at in a raw sugar factory has been presented. Proven Tongaat by:solutions to some of the practical problems which (i) The wide variations i n flow stemming from were being experienced at the Tongaat Sugar Comtwo different-sized milling trains which gave pany factory are 'described, while mention is also...

متن کامل

Radiation safety at an atomic energy factory.

Many people still think of atomic energy as a matter of scientists with scientific assistants and laboratories with laboratory-type equipment. The factories of the Industrial Group of the U.K. Atomic Energy Authority are controlled and directed by engineers and industrial chemists as well as by physicists, most of whom must be as skilled in management as they are in the technical complexities o...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: International Journal of Engineering, Science and Technology &b. Lagos

سال: 2022

ISSN: ['2141-2839']

DOI: https://doi.org/10.4314/ijest.v14i3.4s