Energy Conservation and Gravitational Wavelength Effect of the Gravitational Propagation Delay Analysis
نویسندگان
چکیده
منابع مشابه
Energy Conservation at the Gravitational Collapse
We apply the principle of energy conservation to the motion of the test particle in gravitational field by requiring that its energy, gained by gravitation, has to be balanced by decrease of its rest mass. Due to the change of mass in gravitational field Newton's force law between gravitating bodies is modified, too. With this modified force law we build up the the classical field theory of gra...
متن کاملEnergy Density and Pressure of Long Wavelength Gravitational Waves
Inflation leads us to expect a spectrum of gravitational waves (tensor perturbations) extending to wavelengths much bigger than the present observable horizon. Although these gravity waves are not directly observable, the energy density that they contribute grows in importance during the radiationand dust-dominated ages of the universe. We show that the back reaction of tensor perturbations dur...
متن کاملOn the Convergence Analysis of Gravitational Search Algorithm
Gravitational search algorithm (GSA) is one of the newest swarm based optimization algorithms, which has been inspired by the Newtonian laws of gravity and motion. GSA has empirically shown to be an efficient and robust stochastic search algorithm. Since introducing GSA a convergence analysis of this algorithm has not yet been developed. This paper introduces the first attempt to a formal conve...
متن کاملOn the Convergence Analysis of Gravitational Search Algorithm
Gravitational search algorithm (GSA) is one of the newest swarm based optimization algorithms, which has been inspired by the Newtonian laws of gravity and motion. GSA has empirically shown to be an efficient and robust stochastic search algorithm. Since introducing GSA a convergence analysis of this algorithm has not yet been developed. This paper introduces the first attempt to a formal conve...
متن کاملGravitational Energy
Observers at rest in a stationary spacetime flat at infinity can measure small amounts of rest-mass+internal energies+kinetic energies+pressure energy in a small volume of fluid attached to a local inertial frame. The sum of these small amounts is the total “matter energy” EM for those observers. If Mc 2 is the total mass-energy, the difference Mc − EM is the binding gravitational energy. Misne...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Journal of Applied Mathematics and Physics
سال: 2017
ISSN: 2327-4352,2327-4379
DOI: 10.4236/jamp.2017.54080