Energy-Conscious Scheduling Problem in a Flexible Job Shop Using a Discrete Water Wave Optimization Algorithm

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Multi-objective flexible job-shop scheduling problem using modified discrete particle swarm optimization

Taking resource allocation into account, flexible job shop problem (FJSP) is a class of complex scheduling problem in manufacturing system. In order to utilize the machine resources rationally, multi-objective particle swarm optimization (MOPSO) integrating with variable neighborhood search is introduced to address FJSP efficiently. Firstly, the assignment rules (AL) and dispatching rules (DR) ...

متن کامل

Flexible Job Shop Scheduling Using a Multiobjective Memetic Algorithm

This paper addresses the flexible job shop scheduling problem with minimization of the makespan, maximum machine workload, and total machine workload as the objectives. A multiobjective memetic algorithm is proposed. It belongs to the integrated approach, which deals with the routing and sequencing sub-problems together. Dominance-based and aggregation-based fitness assignment methods are used ...

متن کامل

solving flexible job-shop scheduling problem using hybrid algorithm based on gravitational search algorithm and particle swarm optimization

job shop scheduling problem has significant importance in many researchingfields such as production management and programming and also combinedoptimizing. job shop scheduling problem includes two sub-problems: machineassignment and sequence operation performing. in this paper combination ofparticle swarm optimization algorithm (pso) and gravitational search algorithm(gsa) have been presented f...

متن کامل

A New model for integrated lot sizing and scheduling in flexible job shop problem

In this paper an integrated lot-sizing and scheduling problem in a flexible job shop environment with machine-capacity-constraint is studied. The main objective is to minimize the total cost which includes the inventory costs, production costs and the costs of machine’s idle times. First, a new mixed integer programming model,with small bucket time approach,based onProportional Lot sizing and S...

متن کامل

A new biogeography-based optimization (BBO) algorithm for the flexible job shop scheduling problem

Biogeography-based optimization (BBO) algorithm is a new kind of optimization technique based on biogeography concept. This population-based algorithm uses the idea of the migration strategy of animals or other species for solving optimization problems. In this paper, the BBO algorithm is developed for flexible job shop scheduling problem (FJSP). It means that migration operators of BBO are dev...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: IEEE Access

سال: 2019

ISSN: 2169-3536

DOI: 10.1109/access.2019.2930281