End-to-End Packet Delay Analysis and Modeling Concept in Multi-Hop Wireless Network

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Scheme to Provide Proportionally Differentiated End-to-End Packet Delay in Wireless Multi-hop Ad Hoc Networks

This paper proposes a scheme to provide in a CSMA/CA based multi-hop wireless ad hoc network, a consistent and accurate proportional differentiation in average end-to-end packet delay. The proposed scheme, called PDMED uses a cross-layer approach that requires a distributed scheduler to adapt to the information from a QoS monitor, a route monitor and a channel monitor. Conceptually, the distrib...

متن کامل

Improving End-to-end Packet Delivery in High Traffic Multi-hop Wireless Ad Hoc Networks

Accurate link quality estimation is an important building block in quality aware routing. In an inherently lossy, unreliable and dynamic medium such as wireless, the task of accurate estimation becomes very challenging. Over the years ETX has been widely used as a reliable link quality estimation metric. However, more recently it has been established that under heavy traffic loads ETX performan...

متن کامل

Sleep/wake scheduling scheme for minimizing end-to-end delay in multi-hop wireless sensor networks

We present a sleep/wake schedule protocol for minimizing end-to-end delay for event driven multi-hop wireless sensor networks. In contrast to generic sleep/wake scheduling schemes, our proposed algorithm performs scheduling that is dependent on traffic loads. Nodes adapt their sleep/wake schedule based on traffic loads in response to three important factors, (a) the distance of the node from th...

متن کامل

Providing End-to-End Delay Guarantees for Multi-hop Wireless Sensor Networks over Unreliable Channels

Wireless sensor networks have been increasingly used for real-time surveillance over large areas. In such applications, it is important to support end-toend delay constraints for packet deliveries even when the corresponding flows require multi-hop transmissions. In addition to delay constraints, each flow of real-time surveillance may require some guarantees on throughput of packets that meet ...

متن کامل

Stochastic Network Calculus for End-to-end Delay Evaluation of Avionics Multi-hop Virtual Links

The VL (Virtual Link) concept used by AFDX network of modern aircraft such as A380 represents a big assumption for input flows characteristics. But mapping of many VL on a multi switch Ethernet architecture lead to potential congestion on a port of a (given) switch. Thus, there is strong need to prove that no frame will be lost by the network (no switch queue will overflow) and to evaluate the ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: International Journal of Engineering & Technology

سال: 2018

ISSN: 2227-524X

DOI: 10.14419/ijet.v7i4.36.23925