Employer Toxic Leadership and Implications for Managing Risk and Stakeholder Management: a Road Improvement Project in Nepal

نویسندگان

چکیده

This is a research paper that focused on assessing the impacts of Employer Toxic Leadership in terms Risk and Stakeholders Management an 81Km road construction project Nepal. An interpretive methodology was utilised order to help understand implicitly management leadership’s impact project. The scope for this on-site supervisory team. targeted population interest made up 15 engineers located at offices early phase outcomes consisted six (6) main themes with corresponding nineteen (19) sub-themes.The addresses raised issues toxic leadership within risk stakeholder establishes implications continuing management. also indicates conducts inadequate especially relation variety stakeholders thus faces serious performance leading failure.The considered be very weak environment due institutional style, orientation lack professional engagement stakeholders. (government department - DoR) has purposely negatively altered quality delivery expectations resulting questions over its operational governance stance financial efficacy.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

passivity in waiting for godot and endgame: a psychoanalytic reading

this study intends to investigate samuel beckett’s waiting for godot and endgame under the lacanian psychoanalysis. it begins by explaining the most important concepts of lacanian psychoanalysis. the beckettian characters are studied regarding their state of unconscious, and not the state of consciousness as is common in most beckett studies. according to lacan, language plays the sole role in ...

Managing Information for a Risk Based Approach to Stakeholder Management

This paper proposes a risk based approach in order to obtain a quantitative estimate of the salience of the stakeholders involved in a project. The integration between stakeholders and risk management processes in the Project Management System allows us to realize a twofold objective: a quantitative estimate of the salience of each stakeholder in terms of the contribution to the overall project...

متن کامل

Using fuzzy FMEA and fuzzy logic in project risk management

Risk management is one of the most important phases of project management and isthe most recently used by many researchers. In this paper, a fuzzy based method wasproposed which identifies different kinds of risks through the project life cycle.Then, the project risk magnitude can be obtained in regards to five factors, namely“severity”, “occurrence”, and “not detection” which form fuzzy FMEA a...

متن کامل

a framework for identifying and prioritizing factors affecting customers’ online shopping behavior in iran

the purpose of this study is identifying effective factors which make customers shop online in iran and investigating the importance of discovered factors in online customers’ decision. in the identifying phase, to discover the factors affecting online shopping behavior of customers in iran, the derived reference model summarizing antecedents of online shopping proposed by change et al. was us...

15 صفحه اول

Quantitative risk management in gas injection project: a case study from Oman oil and gas industry

The purpose of this research was to study the recognition, application and quantification of the risks associated in managing projects. In this research, the management of risks in an oil and gas project is studied and implemented within a case company in Oman. In this study, at first, the qualitative data related to risks in the project were identified through field visits and extensive interv...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Enterprise risk management

سال: 2022

ISSN: ['1937-7916']

DOI: https://doi.org/10.5296/erm.v7i1.20274