Electrical Power Systems Availability in Buildings Exposed to Seismic Hazard—Part I: Electrical Criteria and Part II: Mechanical Criteria

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Power and energy as systemic properties - Part I: Electrical circuits

We examine some aspects of the nature of physical energy and power for electrical circuits. The question raised is how energy is transferred from the environment to a circuit, or between circuits. Does this transfer occur terminal by terminal, or does it happen along a set of terminals? In other words, is the transfer of energy a ‘local’ or a ‘global’ phenomenon? The main conclusion drawn from ...

متن کامل

Criteria for Seismic Risk Reduction of Earthquake Resistant Buildings

Most of the existing seismic design codes are based on the empirical knowledge accumulated through systematic earthquake damage data collection and their analysis. Required levels of protection and seismic design forces gradually are increased after each series of catastrophic earthquakes particularly in developed countries. Many efforts have been made through experimental and analytical studie...

متن کامل

Asynchronous CDMA Systems with Random Spreading-Part II: Design Criteria

Totally asynchronous code-division multiple-access (CDMA) systems are addressed. In Part I, the fundamental limits of asynchronous CDMA systems are analyzed in terms of spectral efficiency and SINR at the output of the optimum linear detector. The focus of Part II is the design of low-complexity implementations of linear multiuser detectors in systems with many users that admit a multistage rep...

متن کامل

A DSS Based on Multiple Criteria Decision Making for Maintenance Planning in an Electrical Power Distributor

Inspection Policy: There is an inspection calendar which covers the entire power distribution network in a period of 10 years, which is based in periodical inspection activities that take place at one, two, five and ten year intervals Usually there are 25 thousand orders to repair potential failure built based on the company inspection calendar and recorded system In order to assure the quality...

متن کامل

A Heuristic Approach to Distributed Generation Source Allocation for Electrical Power Distribution Systems

The recent trends in electrical power distribution system operation and management are aimed at improving system conditions in order to render good service to the customer. The reforms in distribution sector have given major scope for employment of distributed generation (DG) resources which will boost the system performance. This paper proposes a heuristic technique for allocation of distribut...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: IEEE Transactions on Industry Applications

سال: 2011

ISSN: 0093-9994,1939-9367

DOI: 10.1109/tia.2010.2091480