Electrical Energy Auditing And Enhanchment of Power System at Basbari Water Treatment Plant, Kathmandu
نویسندگان
چکیده
The water treatment plant (WTP) employs a variety of electrical machines and utilities, making it an intensive energy consumption plant. In this study, audit was conducted on the Basbari WTP in Kathmandu, Nepal to identify hotspots that consume most recommend solutions for energy-efficient operation. A power quality analyzer used analyze patterns parameters data from electricity authority. study found transmission pumps backwash/makeup 77% 6% energy, respectively. Efficient utilization pump motors could result annual cost savings NRS 160,954.81 pumps, backwash make pumps. payback period light replacement installation capacitor bank is 2.16 years 1.95 years,
منابع مشابه
Electrical Energy Management in Industrial Wastewater Treatment Plant
In this study, the energy consumption of Nasirabad Industrial Park (NIP) treatment plant was evaluated. A combination of up-flow anaerobic baffled reactor (UABR) and aerobic integrated fixed-bed activated sludge (IFAS) processes were employed in NIP. To find out the average electrical energy use per m3 influent wastewater, the rate of energy usage of the plant was calculated by data ...
متن کاملPlantago ovata Medicinal Plant and Water Treatment
Plantago ovata is a medicinal plant of plantain, Plantaginaceae, family used to treat intestinal disorders and stomach diseases. P. ovata grain has relieving effects and healing inflammation and irritation of the mucous layer of stomach and duodenal ulcer. Beside the medicinal benefits, this plant is useful for water turbidity removal. Coagulation and flocculation are important processes in wat...
متن کاملEfficiency of electrical coagulation process using aluminum electrodes for municipal wastewater treatment: a case study at Karaj wastewater treatment plant
Background: The reuse of treated municipal wastewater is an important source of water for different ,purposes. This study evaluated the efficiency of the electrocoagulation process in removing turbidity,a total suspended solids (TSS), chemical oxygen demand (COD), nitrate, and phosphate from wastewater at the treatment facility in Karaj, Iran. Methods: This experimental study was performed at ...
متن کاملPower Distribution Development and Optimization of Hybrid Energy Storage System
In this paper, the development and optimization of Power Distribution Control Strategy (PDCS) have been performed for a Hybrid Energy Storage Systems (HESS) of a Series Hybrid Electric Bus (SHEB). A common PDCS is based on the use of Ultra-Capacitor (UC) pack. A new simple PDCS is developed as a battery based one. For the battery based PDCS, four parameters ar...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Journal of advance college of engineering and management
سال: 2023
ISSN: ['2392-4853']
DOI: https://doi.org/10.3126/jacem.v8i2.55941