Efficient simulation for an open-pit mine
نویسندگان
چکیده
This paper presents an approach towards computationally efficient discrete-event-simulation designed to take advantage of high-performance computing architecture. We demonstrate how computational efficiency combined with large capacity enables quantification and mapping stochastic system performance across a challenging multidimensional parameter space requiring several million individual DES instances. An open-pit mine bulk materials handling case study is presented the approach. A dispatching heuristic controlling operation trucking can be optimised through selection values for four control parameters. The represented by these parameters exhaustively mapped visualised provide insight into relationships between combinations performance. extensive data generated ultimately used within hyper-heuristic determine near-optimal
منابع مشابه
A genetic algorithm approach for open-pit mine production scheduling
In an Open-Pit Production Scheduling (OPPS) problem, the goal is to determine the mining sequence of an orebody as a block model. In this article, linear programing formulation is used to aim this goal. OPPS problem is known as an NP-hard problem, so an exact mathematical model cannot be applied to solve in the real state. Genetic Algorithm (GA) is a well-known member of evolutionary algorithms...
متن کاملAn imperialist competitive algorithm for solving the production scheduling problem in open pit mine
Production scheduling (planning) of an open-pit mine is the procedure during which the rock blocks are assigned to different production periods in a way that the highest net present value of the project achieved subject to operational constraints. The paper introduces a new and computationally less expensive meta-heuristic technique known as imperialist competitive algorithm (ICA) for long-term...
متن کاملA Two-Phase Simulation-Based Optimization of Hauling System in Open-Pit Mine
One of the key issues in mining is the hauling system. Truck and shovels are the most widely used transportation equipment in mines. In this paper, a two-phase simulation-based optimization is presented to maximize utilization of hauling system in the largest Iranian open-pit copper mine. In the first phase, The OptQuest for Arena software package was used to solve the optimization problem to p...
متن کاملVirtualized Reality: an Application to Open-pit Mine Monitoring
In this paper, an infrastructure for monitoring remote equipment and solving some of the logistic challenges of operating satellite surface mines is presented. This infrastructure includes strategies for communicating timely and accurate information amongst operators, planners and supervisors, using off-the-shelf network protocols. Advanced data visualization techniques are implemented, so user...
متن کاملA New Cost Model for Estimation of Open Pit Copper Mine Capital Expenditure
One of the most important issues in all stages of mining study is capital cost estimation. Determination of capital expenditure is a challenging issue for mine designers. In recent decade, quite a few number of studies have focused on proposing estimation models to predict mining capital cost. However, these efforts have not achieved to a predictor model with reliable range of error. Both of ov...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Simulation Modelling Practice and Theory
سال: 2022
ISSN: ['1878-1462', '1569-190X']
DOI: https://doi.org/10.1016/j.simpat.2021.102473