Effective Waterproofing of Railway Culvert Pipes
نویسندگان
چکیده
منابع مشابه
Constraints Based Effective railway Rescheduling System
Delays of trains occur owing to accidents, bad weather conditions, vehicle troubles, etc. Trains run according to the departure order of trains at each station (called "SOT") in the scheduled plan. Therefore, a delay of a train delays its succeeding train, which may result in a chain reaction of delays and confusion arises to the whole network finally. The rescheduling needs to adjust SOT and t...
متن کاملTowards effective culvert design: monitoring seasonal use and behavior by Mediterranean mesocarnivores.
Drainage culverts are known to be used by a diverse number of species. To date, most studies looking at culvert usage have been restricted to the dry season. This seasonal bias has limited our understanding of how different species respond to culverts and, consequently, our ability to find effective ways to promote the use of culverts as aids to species movement. The main goal of this study was...
متن کاملinvestigation of effective parameters on the rigidity of light composite diaphragms (psscb) by fem
در این رساله با معرفی سقف های psscb متشکل از ترکیب ورق های فولادی ذوزنقه ای و تخته های سیمانی الیافی به عنوان سقف های پیش ساخته (سازگار با سیستم سازه ای قاب های فولادی سبک) به بررسی پارامترهای موثر بر صلبیت سقف، پرداخته می شود. در تحقیق حاضر ابتدا به مدل سازی دو نمونه سقف آزمایش شده، به روش اجزاء محدود با استفاده از نرم افزار تحلیلی abaqus ver 6.10 پرداخته شده است. نمونه های ساخته شده تحت اعما...
Risk-cost Approach to Size Detour Culvert
An interim drainage structure provides a short service during the construction months of the permanent drainage structure. This study presents a risk cost approach by which the design flood for an interim drainage structure can be derived from the capacity of the permanent structure, cost-capacity ratio, cost-damage ratio, and construction months during a year. To accommodate various constructi...
متن کاملFullerene pipes
Single-wall fullerene nanotubes were converted from nearly endless, highly tangled ropes into short, open-ended pipes that behave as individual macromolecules. Raw nanotube material was purified in large batches, and the ropes were cut into 100- to 300-nanometer lengths. The resulting pieces formed a stable colloidal suspension in water with the help of surfactants. These suspensions permit a v...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: The Baltic Journal of Road and Bridge Engineering
سال: 2019
ISSN: 1822-427X,1822-4288
DOI: 10.7250/bjrbe.2019-14.453