Effective program planning for multiple projects under limited resources

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Classifier evaluation under limited resources

Existing evaluations measures are insufficient when probabilistic classifiers are used for choosing objects to be included in a limited quota. This paper reviews performance measures that suit probabilistic classification and introduce two novel performance measures that can be used effectively for this task. It then investigates when to use each of the measures and what purpose each one of the...

متن کامل

Scalability in planning with limited resources

Several temporal planning systems (e.g. Allen & Koomen, Descartes , parcPLAN) divide the planning process into two distinct phases: action introduction and plan verification. This thesis develops a detailed model of these two phases and their “interface”, and shows how the model can be exploited to enhance the efficiency of plan generation. The main focus is on plan verification, and the contex...

متن کامل

Classifier Risk Estimation under Limited Labeling Resources

In this paper we propose strategies for estimating performance of a classifier when labels cannot be obtained for the whole test set. The number of test instances which can be labeled is very small compared to the whole test data size. The goal then is to obtain a precise estimate of classifier performance using as little labeling resource as possible. Specifically, we try to answer, how to sel...

متن کامل

A Case Study of Resources Management Planning with Multiple Objectives and Projects

Each National Park Service unit in the United States produces a resources management plan (RMP) every four years or less. The plans commit budgets and personnel to specific projects for four years, but they are prepared with little quantitative and analytical rigor and without formal decision-making tools. We have previously described a multiple objective planning process for inventory and moni...

متن کامل

Flexibility planning for managing R&D projects under risk

Incorporating managerial flexibility in an innovative R&D project is important, because managers face greater uncertainty in today’s competitive and dynamic changing environment. It is essential to bring managerial flexibility into R&D project planning to decrease technical and market risks, while increasing potential market value. The objective of this paper is to develop a flexibility plannin...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Mathematical Modelling

سال: 1987

ISSN: 0270-0255

DOI: 10.1016/0270-0255(87)90062-5