Effective expediting to improve project due date and cost performance through buffer management

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Preemptive expediting to improve project due date performance

Project expediting is often viewed as a corrective action taken in response to prior scheduling errors and is usually applied in the later stages of projects when it appears that predefined due dates will not be met. However, large-scale projects with uncertain activity durations tend to have numerous probabilistic network paths with complex interactions that require some level of expediting to...

متن کامل

Integrated Due Date Management through Iterative Bidding

This paper proposes an iterative bidding framework for integrated due date management decision making. We focus on a type of make-to-order environment, in which a firm needs to quote due dates and prices and to schedule the production of a variety of job orders required by a large group of customers. In most cases, customers prefer shorter due dates. However, given limited production capacity a...

متن کامل

using chip master planning in automatic asic design flow to improve performance and buffer resource management

modern integrated circuits consist of millions of standard cells and routing paths. in nano-scale designs, mis-prediction is a dominant problem that may diminish the quality of physical design algorithms or even result in the disruption of the convergence of the design cycle. in this paper, a new planning methodology is presented in which a master-plan of the chip is constructed at the early le...

متن کامل

Due-date performance improvement using TOC's aggregated time buffer method at a wafer fabrication factory

Due-date performance is one of the most important production indexes for success utilized by wafer fabrication factories. Traditionally, the industry sets a specific due-date tightness level and a dispatching rule based on the total processing time, the production capacity, pre-defined order release criteria and historical data, to ensure deliveries are made on-time. However, such policies typi...

متن کامل

Ehhancing Project Cost Management through Teamwork and Information System

The primary objective of project management is to complete a project within a targeted cost, schedule, and performance standard. Often, the project cost is managed by various parties of an organization with incongruent viewpoints and interests. Different perspectives stemming from their diverse backgrounds and interests can pose a major challenge towards successful project management. The spect...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: International Journal of Production Research

سال: 2014

ISSN: 0020-7543,1366-588X

DOI: 10.1080/00207543.2014.948972