Effect of sink location and redundancy on multi‐sink wireless sensor networks: a capacity and delay analysis

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Sink Location Service Based on Fano Plane in Wireless Sensor Networks

Sink location is considered as a basic service in geographic routing in wireless sensor networks. Obtaining the location of sink node by source node using an efficient method with low complexity has always been a challenging issue in research. In this paper, a sink location algorithm based on Fano plane is proposed. The research challenge is how to ensure the intersection of two SLQ (Location Q...

متن کامل

sink location service based on fano plane in wireless sensor networks

sink location is considered as a basic service in geographic routing in wireless sensor networks. obtaining the location of sink node by source node using an efficient method with low complexity has always been a challenging issue in research. in this paper, a sink location algorithm based on fano plane is proposed. the research challenge is how to ensure the intersection of two slq and sla rou...

متن کامل

effect of seed priming and irrigation regimes on yield,yield components and quality of safflowers cultivars

این مطالعه در سال 1386-87 در آزمایشگاه و مزرعه پژوهشی دانشگاه صنعتی اصفهان به منظور تعیین مناسب ترین تیمار بذری و ارزیابی اثر پرایمینگ بر روی سه رقم گلرنگ تحت سه رژیم آبیاری انجام گرفت. برخی از مطالعات اثرات سودمند پرایمینگ بذر را بر روی گیاهان مختلف بررسی کرده اند اما در حال حاضر اطلاعات کمی در مورد خصوصیات مربوط به جوانه زنی، مراحل نموی، عملکرد و خصوصیات کمی و کیفی بذور تیمار شده ژنوتیپ های م...

A multiple criteria algorithm for planning the itinerary of mobile sink in wireless sensor networks

The mobile sink can increase the efficiency of wireless sensor networks. It moves in a monitored environment and collects the network nodes information. Thus, by the sink we can balance the power consumption and increases the network lifetime. Determining path of the sink's movement is usually modeled as an optimization problem where finding optimal solutions require collecting value of all the...

متن کامل

An Energy Efficient Clustering Method using Bat Algorithm and Mobile Sink in Wireless Sensor Networks

Wireless sensor networks (WSNs) consist of sensor nodes with limited energy. Energy efficiency is an important issue in WSNs as the sensor nodes are deployed in rugged and non-care areas and consume a lot of energy to send data to the central station or sink if they want to communicate directly with the sink. Recently, the IEEE 802.15.4 protocol is employed as a low-power, low-cost, and low rat...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: IET Communications

سال: 2018

ISSN: 1751-8628,1751-8636

DOI: 10.1049/iet-com.2017.1040