EFFECT OF PERIODIC FLUCTUATION BEHIND BUILDING ON REATTACHMENT LENGTH : Large eddy simulation of flowfield around a high-rise building (Part 1)

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Analysis of unsteady concentration and flow statistics around an isolated building by Large-Eddy Simulation

Large-Eddy Simulation is used to simulate wind-induced pollutant dispersion from a vent on the roof of a cubical building. The profiles of the computed mean value and standard deviation of the concentration in the wake of the building are compared to wind-tunnel measurements and good agreement is found. The velocity and concentration values at two monitoring points located in the shear layer de...

متن کامل

the effect of explicit instruction of metacognitive strategies on reading comprehension among iranian high school students

the present study seeks to determine the effect of explicit instruction of metacognitive strategies on iranian high school students’ reading comprehension ability. it also attempts to investigate the relationship between the learners reading comprehension and metacognitive strategies. furthermore, the study investigates whether iranian efl female high school students are high, medium, or low me...

effect of oral presentation on development of l2 learners grammar

this experimental study has been conducted to test the effect of oral presentation on the development of l2 learners grammar. but this oral presentation is not merely a deductive instruction of grammatical points, in this presentation two hypotheses of krashen (input and low filter hypotheses), stevicks viewpoints on grammar explanation and correction and widdowsons opinion on limited use of l1...

15 صفحه اول

Scheduling for High-rise Building Construction Using Simulation Techniques

High-rise buildings are commonly built in densely populated countries or urban areas. A balanced floor construction cycle is critical for construction of the frame structures. The objectives in scheduling the floor cycle are to ensure smooth flows of resources and to optimise the use of formwork and other materials. The floor area is usually divided into zones to allow the labour force and form...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of Environmental Engineering (Transactions of AIJ)

سال: 2004

ISSN: 1348-0685,1881-817X

DOI: 10.3130/aije.69.45_3