EFFECT OF CONSTRUCTION DELAYS ON PROJECT TIME OVERRUN: INDIAN SCENARIO
نویسندگان
چکیده
منابع مشابه
effect of oral presentation on development of l2 learners grammar
this experimental study has been conducted to test the effect of oral presentation on the development of l2 learners grammar. but this oral presentation is not merely a deductive instruction of grammatical points, in this presentation two hypotheses of krashen (input and low filter hypotheses), stevicks viewpoints on grammar explanation and correction and widdowsons opinion on limited use of l1...
15 صفحه اولthe effect of explicit teaching of metacognitive vocabulary learning strategies on recall and retention of idioms
چکیده ندارد.
15 صفحه اولa study on construction of iranian life tables: the case study of modified brass logit system
چکیده ندارد.
15 صفحه اولScenario of solid waste management in present Indian context
A trend of significant increase in municipal solid waste generation has been recorded worldwide. This has been found due to over population growth rate, industrialization, urbanization and economic growth. Consumerism speed has been found very high covering around more then 50% of total population since last decade due to higher economic growth, which has ultimately resulted in increased solid ...
متن کاملFrequency of time overrun causes in road construction in Palestine : Contractors
Time, cost and quality have their proven importance as the prime measures for project success. However, the history of the construction industry worldwide is full of projects that were completed with significant time and cost overruns. This study is conducted to investigate the occurrence frequency of time overrun causes in road construction projects in the West Bank in Palestine from contracto...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: International Journal of Research in Engineering and Technology
سال: 2014
ISSN: 2321-7308,2319-1163
DOI: 10.15623/ijret.2014.0301091