EFFECT OF CONSTRUCTION DELAYS ON PROJECT TIME OVERRUN: INDIAN SCENARIO

نویسندگان

چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

effect of oral presentation on development of l2 learners grammar

this experimental study has been conducted to test the effect of oral presentation on the development of l2 learners grammar. but this oral presentation is not merely a deductive instruction of grammatical points, in this presentation two hypotheses of krashen (input and low filter hypotheses), stevicks viewpoints on grammar explanation and correction and widdowsons opinion on limited use of l1...

15 صفحه اول

Scenario of solid waste management in present Indian context

A trend of significant increase in municipal solid waste generation has been recorded worldwide. This has been found due to over population growth rate, industrialization, urbanization and economic growth. Consumerism speed has been found very high covering around more then 50% of total population since last decade due to higher economic growth, which has ultimately resulted in increased solid ...

متن کامل

Frequency of time overrun causes in road construction in Palestine : Contractors

Time, cost and quality have their proven importance as the prime measures for project success. However, the history of the construction industry worldwide is full of projects that were completed with significant time and cost overruns. This study is conducted to investigate the occurrence frequency of time overrun causes in road construction projects in the West Bank in Palestine from contracto...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: International Journal of Research in Engineering and Technology

سال: 2014

ISSN: 2321-7308,2319-1163

DOI: 10.15623/ijret.2014.0301091